Orange County NC Website
3.34 INTENTIONALLY DELETED.............................................................................................................................................................21 <br /> 3.35 PLUMBING(JUN 2012).....................................................................................................................................................................21 <br /> 3.36 DRINKING FOUNTAINS(OCT 2018).................................................................................................................................................21 <br /> 3.37 RESTROOMS(OCT 2020).................................................................................................................................................................21 <br /> 3.38 INTENTIONALLY DELETED.............................................................................................................................................................22 <br /> 3.39 JANITOR CLOSETS(SEP 2015).......................................................................................................................................................22 <br /> 3.40 HEATING,VENTILATION,AND AIR CONDITIONING-SHELL(OCT 2020)....................................................................................22 <br /> 3.41 TELECOMMUNICATIONS: DISTRIBUTION AND EQUIPMENT(SEP 2015)...................................................................................22 <br /> 3.42 TELECOMMUNICATIONS: LOCAL EXCHANGE ACCESS(JUN 2012)..........................................................................................23 <br /> 3.43 LIGHTING: INTERIOR AND PARKING-SHELL(OCT 2020)..........................................................................................................23 <br /> 3.44 ACOUSTICAL REQUIREMENTS(JUN 2012)....................................................................................................................................24 <br /> 3.45 SECURITY FOR NEW CONSTRUCTION(OCT 2019)INTENTIONALLY DELETED........................................................................24 <br /> 3.46 SEISMIC SAFETY FOR NEW CONSTRUCTION(OCT 2020)INTENTIONALLY DELETED.............................................................24 <br /> 3.47 FIRE PROTECTION FOR NEW CONSTRUCTION(APR 2015)INTENTIONALLY DELETED..........................................................24 <br /> 3.48 INTENTIONALLY DELETED.............................................................................................................................................................24 <br /> 3.49 INTENTIONALLY DELETED.............................................................................................................................................................24 <br /> 3.50 INDOOR AIR QUALITY DURING CONSTRUCTION(OCT 2020)......................................................................................................24 <br /> 3.51 SYSTEMS COMMISSIONING(APR 2011)........................................................................................................................................25 <br /> 3.52 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS-LEASE(SEP 2014)..............................25 <br /> 3.53 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS-LEASE(SEP 2014)...................................................................25 <br /> 3.54 INTENTIONALLY DELETED.............................................................................................................................................................25 <br /> SECTION 4 DESIGN,CONSTRUCTION,AND POST AWARD ACTIVITIES..............................................................................................26 <br /> 4.01 SCHEDULE FOR COMPLETION OF SPACE(OCT 2020)................................................................................................................26 <br /> 4.02 CONSTRUCTION DOCUMENTS(SEP 2012)....................................................................................................................................26 <br /> 4.03 INTENTIONALLY DELETED.............................................................................................................................................................26 <br /> 4.04 INTENTIONALLY DELETED.............................................................................................................................................................27 <br /> 4.05 INTENTIONALLY DELETED.............................................................................................................................................................27 <br /> 4.06 CONSTRUCTION SCHEDULE AND INITIAL CONSTRUCTION MEETING(OCT 2020)...................................................................27 <br /> 4.07 PROGRESS REPORTS(OCT 2020)..................................................................................................................................................27 <br /> 4.08 CONSTRUCTION INSPECTIONS(SEP 2015)...................................................................................................................................27 <br /> 4.09 ACCESS BY THE GOVERNMENT PRIOR TO ACCEPTANCE(SEP 2013)......................................................................................27 <br /> 4.10 ACCEPTANCE OF SPACE AND CERTIFICATE OF OCCUPANCY(SEP 2015)..............................................................................27 <br /> 4.11 LEASE TERM COMMENCEMENT DATE AND RENT RECONCILIATION(JUN 2012).....................................................................27 <br /> 4.12 AS-BUILT DRAWINGS(OCT 2019)...................................................................................................................................................28 <br /> 4.13 (INTENTIONALLY DELETED)...........................................................................................................................................................28 <br /> 4.14 SEISMIC RETROFIT(SEP 2013)INTENTIONALLY DELETED........................................................................................................28 <br /> 4.15 INTENTIONALLY DELETED.............................................................................................................................................................28 <br /> SECTION 5 TENANT IMPROVEMENT COMPONENTS.............................................................................................................................29 <br /> 5.01 TENANT IMPROVEMENT REQUIREMENTS(OCT 2016).................................................................................................................29 <br /> 5.02 INTENTIONALLY DELETED.............................................................................................................................................................29 <br /> 5.03 FINISH SELECTIONS(SEP 2015).....................................................................................................................................................29 <br /> 5.04 WINDOW COVERINGS(JUN 2012)..................................................................................................................................................29 <br /> 5.05 DOORS: SUITE ENTRY(OCT 2019)................................................................................................................................................29 <br /> 5.06 DOORS: INTERIOR(OCT 2019).......................................................................................................................................................29 <br /> 5.07 DOORS: HARDWARE(SEP 2013)...................................................................................................................................................29 <br /> 5.08 DOORS: IDENTIFICATION(JUN 2012)............................................................................................................................................29 <br /> 5.09 PARTITIONS: SUBDIVIDING(OCT 2020)........................................................................................................................................30 <br /> 5.10 WALL FINISHES(OCT 2019)............................................................................................................................................................30 <br /> 5.11 PAINTING-TI(OCT 2019)................................................................................................................................................................30 <br /> 5.12 FLOOR COVERINGS AND PERIMETERS(OCT 2019).....................................................................................................................30 <br /> 5.13 HEATING AND AIR CONDITIONING(JUN 2012)..............................................................................................................................31 <br /> 5.14 ELECTRICAL: DISTRIBUTION(SEP 2015)......................................................................................................................................31 <br /> 5.15 TELECOMMUNICATIONS: DISTRIBUTION AND EQUIPMENT(JUN 2012)...................................................................................31 <br /> 5.16 TELECOMMUNICATIONS: LOCAL EXCHANGE ACCESS(AUG 2008).........................................................................................31 <br /> 5.17 DATA DISTRIBUTION(OCT 2020)....................................................................................................................................................31 <br /> 5.18 ELECTRICAL,TELEPHONE, DATA FOR SYSTEMS FURNITURE(OCT 2020)...............................................................................31 <br /> 5.19 LIGHTING: INTERIOR AND PARKING-TI(SEP 2015)..................................................................................................................32 <br /> 5.20 AUTOMATIC FIRE SPRINKLER SYSTEM-TI(OCT 2016)..............................................................................................................32 <br /> SECTION 6 UTILITIES,SERVICES,AND OBLIGATIONS DURING THE LEASE TERM..........................................................................33 <br /> 6.01 PROVISION OF SERVICES,ACCESS,AND NORMAL HOURS(JUN 2012)....................................................................................33 <br /> 6.02 UTILITIES(APR 2011).......................................................................................................................................................................33 <br /> 6.03 INTENTIONALLY DELETED.............................................................................................................................................................33 <br /> 6.04 INTENTIONALLY DELETED.............................................................................................................................................................33 <br /> 6.05 HEATING AND AIR CONDITIONING(OCT 2020).............................................................................................................................33 <br /> 6.06 OVERTIME HVAC USAGE(OCT 2020).............................................................................................................................................33 <br /> 6.07 JANITORIAL SERVICES(JUL 2020)................................................................................................................................................34 <br /> LEASE NO. 57-37135-21-FA, PAGE 4 LESSOR: GOVERNMENT: GSA TEMPLATE L100 <br /> REV(10/20) <br /> FPAC V11.13.20 <br />