Browse
Search
OTHER-2021-030 USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2021
>
OTHER-2021-030 USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 3:28:25 PM
Creation date
8/27/2021 3:22:13 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2021
Meeting Type
Business
Document Type
Leases
Agenda Item
8-n
Document Relationships
Agenda - 06-15-2021; 8-n - USDA Lease of a Portion of the Orange County Bonnie B. Davis Environmental and Agricultural Center
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 06-15-2021 Virtual Business Meeting
Agenda for June 15, 2021 Board Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 06-15-2021 Virtual Business Meeting
RES-2021-046-A RESOLUTION SUPPORTING A UNITED STATES DEPARTMENT OF AGRICULTURE – REGIONAL FOOD SYSTEMS PARTNERSHIP GRANT APPLICATION BY TRIANGLE J COUNCIL OF GOVERMENTS
(Attachment)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The license or certification to practice in the state where the Building is located from the individual(s)and/or firm(s)providing <br /> architectural and engineering design services. <br /> 4. If the Lessor acquires ownership of the Premises or other controlling interest after Lease award, evidence that the Lessor has <br /> obtained ownership or other controlling interest of the Property. <br /> C. The Government shall have the right to withhold approval of design intent drawings(DIDs)until the conditions specified in sub-paragraphs A <br /> and B have been satisfied. <br /> D. Within ten(10)calendar days after the LCO issues the Notice To Proceed(NTP)for TI construction,the Lessor shall provide to the LCO <br /> evidence of: <br /> 1. Award of a construction contract for Tls with a firm completion date. This date must be in accordance with the construction schedule <br /> for Tls as described in the"Schedule for Completion of Space'paragraph of this Lease. <br /> 2. Issuance of required permits for construction of the Tls. <br /> 2.11 INTENTIONALLY DELETED <br /> LEASE NO. 57-37135-21-FA, PAGE 14 LESSOR: GOVERNMENT: GSA TEMPLATE L100 <br /> REV(10/20) <br /> FPAC V11.13.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.