Orange County NC Website
3. The license or certification to practice in the state where the Building is located from the individual(s)and/or firm(s)providing <br /> architectural and engineering design services. <br /> 4. If the Lessor acquires ownership of the Premises or other controlling interest after Lease award, evidence that the Lessor has <br /> obtained ownership or other controlling interest of the Property. <br /> C. The Government shall have the right to withhold approval of design intent drawings(DIDs)until the conditions specified in sub-paragraphs A <br /> and B have been satisfied. <br /> D. Within ten(10)calendar days after the LCO issues the Notice To Proceed(NTP)for TI construction,the Lessor shall provide to the LCO <br /> evidence of: <br /> 1. Award of a construction contract for Tls with a firm completion date. This date must be in accordance with the construction schedule <br /> for Tls as described in the"Schedule for Completion of Space'paragraph of this Lease. <br /> 2. Issuance of required permits for construction of the Tls. <br /> 2.11 INTENTIONALLY DELETED <br /> LEASE NO. 57-37135-21-FA, PAGE 14 LESSOR: GOVERNMENT: GSA TEMPLATE L100 <br /> REV(10/20) <br /> FPAC V11.13.20 <br />