Browse
Search
2020-472-E AMS-Intellicom Southern Campus fiber reroute
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-472-E AMS-Intellicom Southern Campus fiber reroute
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2021 4:37:17 PM
Creation date
8/26/2021 4:36:40 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Providing all of your communication needs including: VOICE * DATA * FIBER OPTICS * PUBLIC ADDRESS * SECURITY <br />Visit us on the Web @ www.intellicomusa.com <br /> <br />2902 S. Miami Blvd., Ste. C <br />Durham, NC 27703 <br />Office: 919.957.1949 <br />Fax: 919.957.8737 <br /> <br />July 21, 2020 <br /> <br /> <br />TO: Angel Barnes <br /> AMS OC <br /> <br /> <br />RE: Seymour Center Bore <br /> <br /> <br />Scope: <br /> <br />Provide and install one 100 pair OSP copper cable and one six strand 62.5 OSP fiber cable. <br /> <br />The cables will be installed by means of direction boring. <br /> <br />The bore will be from the cut cable point at the southwest corner of the lot to the front yard area past <br />the existing driveway exit. This bore is approximately 400 feet. <br /> <br />One new hand hole will be set at the cut cable point and one will be set in the front yard area. <br /> <br />The existing cables will be located and excavated in the front yard. They will be cut and the new cabling <br />will be spliced in place here and at the cut point at the southwest side of the lot. <br /> <br />The splice enclosures and handholes purchased for the original repairs will be re-used for the new <br />splice. <br /> <br /> <br />Total Price: $12,373.00 <br /> <br />Conditions: <br /> <br /> <br /> Conditions: <br />1. . This quote assumes that the areas of excavation are free of rock or other obstacles. <br />This contractor will make every reasonable effort to determine soil conditions prior to <br />the start of the project. Should rock or other obstacles be encountered, one of the <br />following can be implemented: <br />• A rock boring bit and/or air hammer will be used at an increase of cost per foot. <br />• excavation and removal would be handled on a time and materials basis based on <br />industry standard rates for an excavator, dump truck, jack hammer, or any other <br />equipment required. Dumping fees, if required, are also the responsibility of the <br />owner. <br />2. Location of all existing utilities is the responsibility of the owner. Should this contractor <br />be responsible for location other than the services of ULOCO or NC One Call, <br />additional charges would apply. If damage to utilities that have not been marked <br />occurs, repairs will be made in a timely manner to minimize downtime. This would be <br />DocuSign Envelope ID: C357B702-8D6A-4E3A-A92C-1C5F7F9AED63
The URL can be used to link to this page
Your browser does not support the video tag.