Orange County NC Website
34 <br /> 1 Slide #71 <br /> Community Services <br /> Chapel Hill Orange County Visitors Bureau—page 154 <br /> Ocsul Tax Rewrnua History <br /> 9iw0ssv <br /> Etmmo 6kinsm N.+»� <br /> ms Si+oa�+6?da•+• <br /> 91466➢49 — <br /> 9bT6W <br /> ORANGE COUNTY <br /> 2 T1 aaaa][CARDLENA <br /> 3 <br /> 4 Commissioner Greene asked if there is progress on the new building. <br /> 5 Laurie Paolicelli, Visitor Bureau Director, said construction will begin on June 7, 2021 so <br /> 6 everything should be done in the fall. <br /> 7 Travis Myren resumed the PowerPoint presentation: <br /> 8 <br /> 9 Slide #72 <br /> Community Services <br /> • Orange County Transportation Services—page 345 <br /> •Total expendlture budget•$3,021.232 <br /> -yzlz,sis c�.e.aeis�eo.xy eo:mt-0mc9+ea m eabeeyei <br /> • Recommended Budget Changes <br /> -3B3,4B1 revw lncrwaan vp•remg 9renp <br /> -yZbB,159 redcurnin persnnnelend opeaeYingeapa•sea}o oH.zeteoel of vehicle <br /> mminweccontras ra5hwiM•whlcln <br /> ORANGE COUNTY <br /> to w,an cAamU <br /> 11 <br /> 12 Slide #73 <br /> Community Services <br /> • Orange County Transportation Services—page 345 <br /> OUT Division Fan and Hon-Fan Revenue <br /> s+zoo.aoo <br /> woo mo u�.•,xRn <br /> ORANGE COUNTY <br /> 13 is nvanuueoun: <br /> 14 <br /> 15 Commissioner Greene asked if there has ever been a discussion about going fare-free. <br /> 16 Theo Letman, Orange County Transportation Services Director, said a fare study was <br /> 17 done with a consultant firm, which came back with the recommendation not to go fare free <br /> 18 because of the amount of ridership and expenditures associated with it. He said some options <br />