Orange County NC Website
Christopher J. Sandt, P.E.  <br />July 2, 2020  <br />Page 3 of 3  <br />Schedule    <br />Anticipated NTP                                                      July 17, 2020  <br />Submit Preliminary Design Report (PDR)              July 31, 2020  <br />Receive Field Survey/Base Mapping                      August 14, 2020  <br />Receive Subsurface Exploration                             August 14, 2020  <br />Receive County Review of PDR                              August 14, 2020  <br />Submit 95% Construction PS&E                              September 25, 2020  <br />Submit for Permit Review                                      September 25, 2020  <br />Receive County Review of 95% PS&E                     October 9, 2020  <br />Submit 100% PS&E                                                  October 30, 2020  <br />  <br />  <br />We look forward to serving you on this project.  Please let me know if you have any questions or  <br />need additional information.  <br />  <br />Offered by (Engineer):        <br />  <br /> Alpha & Omega Group, PC  <br />     <br />(signature)    <br />  <br />T. Glenn Zeblo/Viceā€President                               <br />  (Printed name/title)        <br />DocuSign Envelope ID: F08C6043-A165-4B95-9C6F-D2E8524A0B94