Browse
Search
2020-358-E-Solid Waste-Draper Aden Associates Inc-SOW Walnut Grove Wastewater
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-358-E-Solid Waste-Draper Aden Associates Inc-SOW Walnut Grove Wastewater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 12:28:18 PM
Creation date
8/25/2021 12:28:03 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walnut Grove Wastewater Disposal System <br />May 11, 2020 Page 4 of 6 <br /> <br /> Produce the necessary project closeout and certification documents necessary to <br />meet the requirements of the local approvals and provide the owner with a <br />record file. Record Documents will be based on field observations and redline as- <br />built drawings provided by the contractor and the observations during the site <br />inspections. DAA shall not have responsibility for acts or omissions of the <br />contractor or subcontractors, their agents or employees, or other persons <br />performing the project construction. <br />Due to the nature of these activities, DAA will complete these items based upon a time and <br />materials basis per our standard rate schedule. For budgeting purposes, we have included an <br />estimated fee for this task in the schedule below. <br /> Deliverables: <br /> Record Drawings as required. <br /> Site Visit reports from onsite inspections <br /> Recommendations of pay requests from the Contractor <br /> Change Order and Field Order documents, as necessary, for Owner execution <br />ADDITIONAL SERVICES <br />All other services not expressly defined above in this task proposal will be considered additional <br />services and could be subject to additional task order proposal(s) and costs. <br /> <br />SCHEDULE <br />DAA proposes to complete Task 1 through Task 2 within 30 days of notice to proceed. Task 3 <br />and 4 are dependent upon permit acceptance and authorization from the Owner, as well as <br />Contractor’s availability and timeline. As such, it is recommended these services be provided on <br />a Time and Materials (T&M) basis. <br /> <br />COMPENSATION <br />Compensation for engineering services and reimbursable expenses shall be based on a lump <br />sum fees presented below. This fee will be invoiced monthly based on our estimation of the <br />percentage complete on each task. <br />Task Estimated Fee <br />Task 1 – Design Phase Services $2,600 <br />Task 2 – Permitting Phase Services $1,000 <br />Task 3 – Bid Administrative Services $1,000 (T&M) <br />Task 4 – Construction Services $1,200 (T&M) <br />Total $5,800 <br /> <br /> <br />DocuSign Envelope ID: 8635ABD6-10C7-47AB-8AC1-DCAF58ABFA25
The URL can be used to link to this page
Your browser does not support the video tag.