Browse
Search
2021-453-E-Solid Waste-Paratus Service Group-Remove and Install lighting system and retrofit for LED lights
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-453-E-Solid Waste-Paratus Service Group-Remove and Install lighting system and retrofit for LED lights
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:21:23 AM
Creation date
8/17/2021 10:21:12 AM
Metadata
Fields
Template:
Contract
Date
8/12/2021
Contract Starting Date
8/12/2021
Contract Ending Date
8/16/2021
Contract Document Type
Agreement
Amount
$46,924.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> <br />A Commercial Integrator for <br /> <br /> Connection to remote keypads, sensors and plug load controllers. <br /> Programming can be performed from hardware or via Apple device (iPhone or iPad). <br />Each room would have an occupancy sensor to provide efficient use of the lighting in the rooms. A Pico <br />wallstation to select the comfortable dimming light level. Daylight harvesting sensors would adjust the light <br />level throughout the day to provide the best light level by room. This system will control all the private <br />offices, conference room, staff lounge, gallery, work room, reception area, lobby hallways and waiting areas <br />and library. The multipurpose is being controlled by a Lutron Grafik-Eye and will remain the same. The Grafik- <br />Eye system is already capable of converting to LED. This project is a turnkey project by Paratus Service Group, <br />a certified Lutron Electronics Integrator. The Phase One and Phase Two turnkey pricing includes the electrical <br />costs associated with Bryant–Durham. The project includes removal, rewiring, installation of new equipment, <br />programming, start up, testing and training. <br />Bill of Materials for Phase One: <br />Qty Model # Description Link <br />26 FCJS-ECO Pow Pak Module for ECO https://www.lutron.com/TechnicalDocumentLibrary/369866.pdf <br />26 LRF2-OCR2B-P-WH Wireless Occupancy Sensors https://www.lutron.com/TechnicalDocumentLibrary/3683197.pdf <br />26 LRF2-DCRB-WH Wireless Daylight Sensors https://www.lutron.com/technicaldocumentlibrary/369262.pdf <br />22 PJ2-3BRL-GWH-L01 Pico Light Control https://www.lutron.com/TechnicalDocumentLibrary/3672821.pdf <br />22 PICO-WBX-ADAPT Pico Wallbox Adapter https://www.lutron.com/TechnicalDocumentLibrary/369987_ENG.pdf <br />22 CW-1-WH Wall Plate https://www.lutron.com/TechnicalDocumentLibrary/369987_ENG.pdf <br />1 HJS-0-FM Vive Hub Flush Mount https://www.lutron.com/TechnicalDocumentLibrary/3691067.pdf <br />12 MRF2S-8S-DV-WH Maestro Wireless Switches https://www.lutron.com/TechnicalDocumentLibrary/3685741_Touchless_Solutions_Sell_Sheet.pdf <br /> <br />Phase Two: This phase is the actual LED retrofit for all the strip fixtures in the main building. This includes all <br />the private offices, hallways, reception, library, and multipurpose room. Again, Phase One prepares the <br />electrical grid for this next phase. Again, Bryant-Durham Services will lead the electrical labor to do the <br />primary upgrade. All the strip fixtures will have the old ballast and tubes removed and replaced with special <br />new customized RemPhos LED Lutron drivers by Light Efficient Design and new T5 LED tubes. The new LED <br />light will provide a better-quality light and will have long lasting energy benefits and lower maintenance costs. <br />Bill of Materials for Phase Two: <br />Qty Model # Description Link <br />93 RP-T5HO-4FT-2L-840-ES-M- <br />G2 <br />RemPhos Retrofit kit for T5 <br />fixtures includes a driver w/2 <br />lamps. Color is 4000 Kelvin <br />https://assets.led-llc.com/spec-sheets/LED-Linear-T5-A-BC_Spec_Sheet.pdf <br /> <br />Administration / Deliverables <br />Before installation: <br /> Initial complete facility walk-thru to validate initial equipment accounting and functionality. <br /> Meet with user management to determine if there are any special needs. <br />During Installation: <br />DocuSign Envelope ID: 8CF67996-515A-45D8-B2DD-0F58229EF6A1
The URL can be used to link to this page
Your browser does not support the video tag.