Browse
Search
OUTBoard Agenda Packet - 081821
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 081821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 2:45:11 PM
Creation date
8/12/2021 2:42:33 PM
Metadata
Fields
Template:
BOCC
Date
8/18/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard-TAS Minutes - 081821
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> ORANGE COUNTY <br /> ORANGE UNIFIED TRANSPORTATION BOARD <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: August 18, 2021 <br /> Action Agenda <br /> Item No. 5.c. <br /> SUBJECT: Small Transportation Projects — Non-STIP <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Summary of NCDOT Non-STIP Funding Nishith Trivedi, Transportation Planner, 919- <br /> Sources for Transportation Improvements 245-2582 <br /> 2. Small Transportation Projects Tom Ten Eyck, Transportation/Land Use <br /> Planner, 919-245-2567 <br /> PURPOSE: To review the running list of non-Strategic Transportation Improvement Program <br /> (Non-STIP) projects maintained by Orange County Transportation Planning Staffand convey any <br /> additional projects that should be added. <br /> BACKGROUND: On April 21, 2021, Transportation Planning staff presented the Small <br /> Transportation Projects — non-STIP — list to the OUTBoard for their bi-annual review. This is an <br /> ongoing list of potential local projects administered by NCDOT. Such projects are: <br /> • High Impact-Low Cost Program and Hazard Elimination Program <br /> • SPOT Safety and SPOT Mobility <br /> • Highway Maintenance Improvement Program (HMIP) <br /> Attachment 1 provides the common characteristics of these local non-STIP projects, such as: <br /> • No right-of-way acquisition, construction ready and under contact in 24 months of approval; <br /> • Costs over $250,000 typically requires resolution of support from local elected body; <br /> • Funding can be paired with other funding sources; and <br /> • Subject to Board of Transportation (BOT) approval. <br /> OUTBoard members reside in all areas of the county and share familiarity with the roads and <br /> any safety or maintenance concerns. Staff has developed an ongoing Small Transportation <br /> Projects list (Attachment 2) and request OUTBoard members assist staff in helping to identify <br /> such local projects as: <br /> • Dangerous intersections or road segments where accidents are known to occur <br /> • Potholes, drainage problems, pavement deteriorations, or similar road conditions <br /> Recent updates to this list include: Norewood Subdivision, Sonoma Way Crosswalk, and Orange <br /> Grove Road Maintenance. Once non-STIP projects meet NCDOTs quantified funding criteria <br /> and are approved, there is little design or public involvement as they are relatively small projects, <br /> with very low impact and are construction ready. Maintenance projects aren't subject to the <br /> same type of criteria but prioritized and implemented based on available funding. Orange <br /> County Transportation Planning staff has had good success with NCDOT in addressing <br /> maintenance needs over the years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.