Browse
Search
OUTBoard Agenda Packet - 081821
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 081821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 2:45:11 PM
Creation date
8/12/2021 2:42:33 PM
Metadata
Fields
Template:
BOCC
Date
8/18/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard-TAS Minutes - 081821
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> Metropolitan Transportation Plans (MTPs) are the long-range plans for transportation improvements across the region. <br /> They include roadway,transit, rail, bicycle, pedestrian and other transportation projects for the next 30 years.2 These <br /> plans are fiscally-constrained and function as a subset of the CTP; if the CTP is the outermost layer of an onion,the MTP <br /> is the next-most layer below. MTPs are federally-required for Metropolitan Planning Organizations (MPOs) only (and are <br /> not required for Rural Planning Organizations [RPOs]). <br /> Metropolitan Transportation Plan (MTP) <br /> ► Required by federal statute <br /> ► 20 years <br /> ► Fiscally constrained <br /> ► Subset of CTP <br /> ► joint with CAMPO <br /> ► Provides projects for TIP Prioritization <br /> The MTP process is well-defined and takes many years to complete with many technical analyses and opportunities for <br /> public involvement. Ultimately,federal approval is required at the end of the MTP process. <br /> DCIIC What is the MTP Process? <br /> Metropolitan Planning 4rganizaii:: <br /> Planning Tomorrow Today <br /> 8. Federal Approval <br /> 7. Air Quality Conformity <br /> Z <br /> raft MTPed Optionnalysis(Includes intensive public involvernent� <br /> 3. Deficiency Analysis <br /> 2. Socioeconomic Data (population and employment forecasts) <br /> 1. Goals and Objectives <br /> *7�1,a <br /> 2 Retrieved from CAMPO Website <br />
The URL can be used to link to this page
Your browser does not support the video tag.