Browse
Search
OUTBoard Agenda Packet - 081821
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 081821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 2:45:11 PM
Creation date
8/12/2021 2:42:33 PM
Metadata
Fields
Template:
BOCC
Date
8/18/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard-TAS Minutes - 081821
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158(Huffman 6/27/29 FY2031 $936,000 PE funding approved 6/5/18 Brian Ketner <br /> 47962.1.1 Mill Road). Construct additional right turn lane on 1-40 WB <br /> 47962.2.1 Ramp and improve operations at SR 1308(Garden Road) <br /> 47962.3.1 intersection in Burlington <br /> U-6009 Widen and construct center turn lane on US70(West Church 1/1/40 FY2040 $6,337,000 Planning and design activities on Rob Weisz <br /> 47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington hold <br /> 47144.2.1 <br /> 47144.3.1 <br /> 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 1/1/40 FY2040 $12,400,000 PE funding scheduled for 12/4/24 Laura Sutton <br /> 48689.1.1 (Trollingwood-Hawfields Road)in Mebane <br /> 48689.2.1 <br /> 48689.3.1 <br /> Page 3 BGUMPO Aug 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.