Orange County NC Website
22 <br /> NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6007G Installation of overhead flasher on NC 49 at SR 1130 Jun.2022 Nov.2022 $9,900 Funds approved 3/5/20 and Dawn McPherson <br /> 49117.1.1 (Friendship Patterson Mill Road)south of Burlington. released 6/23/20-Overhead flasher <br /> 49117.3.1 installed-Final Inspection <br /> Completed 5/28/2021 <br /> W-5807B Installation of ADA curb ramps and pedestrian accessible 5/30/21 FY2024 $75,000 PE funds scheduled to be released Dawn McPherson <br /> 48952.1.3 signals on SR 1301 (Boone Station Drive)at SR 1301 (St. 2/2/21 -Construction Underway Chad Reimakoski <br /> 48952.2.3 Marks Church Road)and Boone Station Drive(non-system) <br /> 48952.3.3 at Glidewell Road/Tiki Lane(non-system)in Burlington <br /> U-6017 Intersection improvements at NC 54(East Harden St.)and 2/16/23 FY2025 $2,500,000 Planning and design activities Rob Weisz <br /> 47162.1.1 NC 49(East Elm St.)in Graham underway <br /> 47162.2.1 <br /> 47162.3.1 <br /> U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada Road) 11/21/23 FY2026 $9,000,000 Planning and design activities Rob Weisz <br /> 50234.1.1 to US 70(South Church Street)in Burlington underway <br /> 50234.2.1 <br /> 50234.3.1 <br /> U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 12/19/23 FY 2026 $5,200,000 Planning and design activities Rob Weisz <br /> 47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway <br /> 47158.2.4 (non-system)in Mebane. <br /> 47158.3.4 <br /> U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 5/21/24 FY 2026 $11,300,000 Planning and design activities Rob Weisz <br /> 47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882 <br /> 47159.2.1 Hanover Rd)to Morningside Drive in Burlington <br /> 47159.3.1 <br /> U-6011 Intersection improvements at US 70(South Church Street) 8/20/24 FY2026 $2,400,000 Planning and design activities Brian Ketner <br /> 47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway <br /> 47146.2.1 <br /> 47146.3.1 <br /> B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/20/26 FY2027 $2,500,000 PE funding approved 5/6/19 Kevin Fischer <br /> 48709.1.1 SR 1928(Trollingwood Road)in Haw River <br /> 48709.2.1 <br /> 48709.3.1 <br /> Page 2 BGUMPO Aug 2021 <br />