Orange County NC Website
21 <br /> NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-4907BQ Intersection improvements(All Way Stop)at SR 1005 5/1/21 Jun.2021 $22,500 R/W 4-way stop installation and flasher Derek Dixon <br /> 44757.1.1 (Greensboro-Chapel Hill Road)at SR 2369(Sylvan $153,000 CON completed 4/17/18,utility relocations <br /> 44757.2.1 School Road)and SR 2371 (Pleasant Hill Road)in Snow complete,widening delayed to <br /> 44757.3.1 Camp. Spring 2022 <br /> 48798 Installation of crosswalks and pedestrian signals and update Dec.2021 Jul.2022 $150,394 Construction Pending Dawn McPherson <br /> curb ramps at the intersection of US 70(South Church Street) Derek Dixon <br /> and Edgewood Avenue(non-system)in Burlington. <br /> 47786 Intersection improvements on SR 1007(Mebane Oaks Rd)at Apr.2021 Jun.2021 $898,500 Design complete,ROW acquisition Chad Reimakoski <br /> SM-5707B SR 2126/2128(Old Hillsborough Rd)south of Mebane. underway-100%complete with Derek Dixon <br /> 47903.2.1 Improvements include addition of left and right turn lanes, right of entry, Utility relocations <br /> radii widening,signal installation, resurfacing,and pavement pending -Construction to begin <br /> markings. after utility relocations <br /> SS-6007Y Intersection improvements(all-way stop and overhead 1/3/2022 6/30/22 $29,700 Planning and design activities Dawn McPherson <br /> 49709.1.1 flasher)at intersection of SR 1005(Greensboro Chapel Hill underway <br /> 49709.3.1 Road)at SR 1004(Snow Camp Road)in Snow Camp. <br /> U-6010 Intersection improvements at US 70(South Church Street) 4/19/22 FY 2024 $8,400,000 Planning and design activities Brian Ketner <br /> 47145.1.1 and SR 1226/SR 1311 (University Drive)in Burlington underway, ROW acquisition <br /> 47145.2.1 underway <br /> 47145.3.1 <br /> SS-6007A All-Way Stop installation with overhead flashers,and rumble Jun.2021 Oct.2021 $61,200 Funds approved and released Dawn Mcpherson <br /> 48886.1.1 strips installation at NC 49 and SR 1005(West Greensboro 9/11/19-Construction began <br /> 48886.3.1 Chapel Hill Road). 7/28/2021 <br /> B-5728 Replace Bridge#112 over Reedy Fork Creek on NC87 in 11/16/21 FY2024 $6,200,000 Planning and design activities Kevin Fischer <br /> 45684.1.1 Ossipee complete-ROW underway <br /> 45684.2.1 <br /> 45684.3.1 <br /> Page 1 BGUMPO Aug 2021 <br />