Browse
Search
OUTBoard Agenda Packet - 081821
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 081821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 2:45:11 PM
Creation date
8/12/2021 2:42:33 PM
Metadata
Fields
Template:
BOCC
Date
8/18/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard-TAS Minutes - 081821
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 6.a. Technical Committee 7/28/2021 Item 12 15 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> U-6245 Construct paved shoulders,turn lanes and overlay on SR Oct.2020 Nov.2020 $829,000 Construction 100%complete-Pending Chad Reimakoski <br /> 49187.1.1 1146(West Ten Road)from SR 1114(Buckhorn Road)to Final Inspection <br /> 49187.2.1 west of SR 1137(Bushy Cook Road) <br /> 49187.3.1 <br /> P-5701 Construct Platform, Passenger Rail Station Building at 10/19/2021 FY2023 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough <br /> 46395.3.1 <br /> 1-3306A 1-40 widening from 1-85 to Durham Co. line(US 15/501 8/17/2021 FY2024 $175,600,000 Planning and design activities underway, Laura Sutton <br /> 34178.1.3 Interchange)in Chapel Hill RFQ Advertisement DB 11/3/20 <br /> 34178.1.4 <br /> 34178.1.5 <br /> 34178.2.2 <br /> 34178.3.GV3 <br /> SS-6007R Traffic signal revisions and high visibility crosswalk Mar.2022 Jun.2022 $12,600 Funds approved March 2021 Dawn McPherson <br /> 49557.1.1 installation on SR 1010(East Franklin Street)at Henderson <br /> 49557.3.1 Street. <br /> SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) Jun.2022 Nov.2022 $261,000 Planning and design activities underway Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement <br /> 47936.3.1 and grading shoulders. <br /> SS-6007E All Way Stop installation and flashing beacon revisions at the Jun. 2022 Sept. 2022 $28,800 Funds approved 3/5/20 but not released Dawn McPherson <br /> 49115.1.1 intersection of SR 1005(Old Greensboro Road)and SR <br /> 49115.3.1 1956(Crawford Dairy Road/Orange Chapel Clover Garden <br /> Road) <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chris Smitherman <br /> 45910.1.1 (Buckhorn Road)to West of SR 1006(Orange Grove Road) <br /> 45910.3.1 <br /> Page 1 DCHCMPO Jun.2021 <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.