Browse
Search
BbTF Minutes 06-16-2021
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Broadband Task Force
>
2021
>
BbTF Minutes 06-16-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 2:41:32 PM
Creation date
8/12/2021 2:37:36 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
term approaches need to be in same RFP;Jim responds that they don't; Keith (NCDIT) <br /> said people aren't using 100/100 today but the ARPA funds are focused on future proof <br /> speeds/technologies; NCDIT said they would help by reviewing RFP but wouldn't help <br /> set up meeting (this is contrary to what Jeff said in a previous meeting); can still work on <br /> provider meeting if we need a face-to-face or virtual meeting;Todd—vendor meeting <br /> still makes sense;Todd knows vendor who wants to attend and talk about FTTH; says <br /> State has STOPGAP$$ available; Terri disagrees that the short and long term can be <br /> blended into one RFP; goal to cover everyone in county 100/10 in 18 months;Jim - <br /> ECC/CTC, design of network could be $1million;Todd—design/engineering has be to <br /> done so needs to be included in overall cost of project; SG -can talk about short and <br /> long term solutions in provider meeting; CR—if we want someone to act quickly(18 <br /> months), specify that;Jim—how many people and how fast can you get it done?; <br /> OpenBB struggling to get 25/3 because of tree cover, LTE technology and terrain; Comm <br /> McKee- might be confusing if don't keep two solutions separate,fixed wireless not <br /> eligible for ARPA funds, possibly could use State funds for fixed wireless???; CR—if <br /> technology isn't 100/100 (100/20)then can use ARPA otherwise must use different <br /> funding (fixed wireless); fiber is only thing that can perform to technology standards <br /> required; STOPGAP hasn't been voted on yet;Todd—for vendor meeting, have time <br /> allotments so vendors not all in room at same time, agrees that have separate meetings <br /> for short term/long term vendors; need to ask Legal about requirements for"open" <br /> meetings;TB - if reqs are 100/20 is there even a short term solution considering that <br /> vertical assets are required?; Comm McKee—there may be a way to make funding <br /> available for building towers (move$$from one capital project to another); Comm <br /> McKee—proceed with short term solution/vendor meeting, get answers from vendors <br /> then can search for additional funding if options warrant;Jim—provider meeting, which <br /> one needs to be first; new terminology, short term=100/20 and how many households <br /> over 18 months, long term=FTTH and how many households by 12/31/2024; Greenlight <br /> (Wilson) doing 50/50 for$40/month; Comm McKee—move forward with provider <br /> meeting for 100/100 (100/20) and put other options aside for the moment;Terri— <br /> recommends moving forward with provider meeting for fixed wireless for info gathering <br /> purposes—what speeds *can* they get, how long would it take and what would it take <br /> to get V;Terri also asks if we want to own the fiber; Comm McKee is strongly in favor <br /> of owning the fiber;Jim—let providers know that our intention is going to be for OC to <br /> own the fiber network, talk with providers about potential ownership models; major <br /> players are going to want to build their own fiber networks—AT&T,Verizon, Google, <br /> etc; <br /> ■ Agreements <br /> • have a provider meeting for 100/100 solution <br /> • get RFP out—ACTION:Jim to continue working on RFP and <br /> incorporating suggested changes; will add language for OC to own fiber; <br /> have a single document to hand to vendors along with any County <br /> owned assets (towers,water tanks, buildings, etc) by Tues,Jun 22nd <br /> o work with State for early July provider meeting <br /> o Shoot for RFP to be ready by provider meeting <br /> o ACTION: McKee/Greene call meeting of BOCC/Manager to get <br /> decision on OC fiber ownership <br /> o Jim to work with Travis on communicating BOCC decision back <br /> to the group <br />
The URL can be used to link to this page
Your browser does not support the video tag.