Browse
Search
2021-447-E-AMS-Harrod and Assoc. Constructors-Add additional handrails per inspections department
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-447-E-AMS-Harrod and Assoc. Constructors-Add additional handrails per inspections department
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 3:00:15 PM
Creation date
8/11/2021 2:57:57 PM
Metadata
Fields
Template:
Contract
Date
8/5/2021
Contract Starting Date
8/5/2021
Contract Ending Date
8/11/2021
Contract Document Type
Contract
Amount
$168,043.30
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 07/20 <br /> <br />3 <br /> <br />e. If activities related to the performance of this Agreement require specific licenses, <br />certifications, or related credentials Contractor represents that it or its employees, agents <br />and subcontractors engaged in such activities possess such licenses, certifications, or <br />credentials and that such licenses certifications, or credentials are current, active, and not in <br />a state of suspension or revocation. <br /> <br />f. The Contractor is responsible for all physical damage to owned or rented machinery, tools, <br />equipment, forms, and other items owned, rented or used by the Contractor and <br />Subcontractor(s) in the performance of the Work including all of Owner’s property in <br />Contractor’s care, custody, or control, and all such property while it is in transit. <br /> <br />g. The Contractor is solely responsible for obtaining all permits necessary to complete the <br />Work in compliance with all local, state, and federal laws. <br /> <br />5. PAYMENT & TAXES <br />a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br />Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- <br />exceed One Hundred Fifty One Thousand Eight Hundred Thirty Four Dollars <br />($151,834.00) ( This includes the base bid, plus rails for the ramps, and an allowance of <br />$7,500). Not later than the fifth (5th) day of each calendar month the Contractor shall <br />submit to the Owner’s Representative, generally the architect if an architect is retained on <br />the Work, a Request for Payment for work done during the previous calendar month. <br />i. The Request for Payment shall be in form of a standardized invoice or AIA <br />Document G702-703 appropriately addressed to Owner’s Representative at PO Box <br />8181, Hillsborough, NC 27278 and shall show substantially the value of work done <br />during the previous calendar month. <br />ii. The amount due for payment shall be ninety-five percent (95%) of the value of <br />work completed since the last Request for Payment and this amount shall be paid <br />by the Owner on or before the last business day of the month. Owner shall retain <br />five percent (5%). <br />1. Upon Owner’s Representative’s certification that ninety percent (90%) of <br />the Work has been satisfactorily completed retainage may be discontinued. <br />Retainage may be discontinued, at Owner’s Discretion, so long as work <br />continues to be completed satisfactorily and on schedule. <br />iii. Final payment shall not be due to the Contractor until thirty (30) days after one <br />hundred percent (100%) of the Work, including punch list work, has been <br />satisfactorily (as determined by the County) completed and an appropriate affidavit <br />as required in Section 7(c) below has been received by Owner. <br /> <br />b. Should Owner reasonably determine that Contractor has failed to perform the Work related <br />to a Request for Payment, Owner, at its discretion may provide the Contractor ten (10) <br />days to cure the breach. Owner may withhold the accompanying payment withou t penalty <br />until such time as Contractor cures the breach. <br />i. Should Contractor or its representatives fail to cure the breach within ten (10) days, <br />or fail to reasonably agree to such modified schedule, Owner may immediately <br />terminate this Agreement in writing, without penalty or incurring further obligation <br />to Contractor. <br />DocuSign Envelope ID: 0A6DFC39-3D85-4A4A-988A-0BA31AA3CD98DocuSign Envelope ID: 5D3058C7-A1DF-4015-9C0F-A7AA4FAB7B41
The URL can be used to link to this page
Your browser does not support the video tag.