Orange County NC Website
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br /> <br />ALLOWANCES 01 21 00 - 3 <br />C. Change orders prepared to return unused allowance amounts to the Owner shall be subject to the same <br />requirements for the return of appropriate profit and overhead as other change orders in accordance with <br />the Conditions of the Contract. Where the Contractor has been directed not to include his related costs <br />(profit and overhead) in the Contract Sum for contingency allowances, the return of profit and overhead <br />shall not be excepted. <br />1.8 UNUSED MATERIALS <br />A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, <br />after installation has been completed and accepted. <br />1. If requested by Architect, prepare unused material for storage by Owner when it is not <br />economically practical to return the material for credit. If directed by Architect, deliver unused <br />material to Owner's storage space. Otherwise, disposal of unused material is Contractor's <br />responsibility. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged <br />or defective products to manufacturer for replacement. <br />3.2 PREPARATION <br />A. Coordinate materials and their installation for each allowance with related materials and installations to <br />ensure that each allowance item is completely integrated and interfaced with related work. <br />3.3 SCHEDULE OF ALLOWANCES <br /> <br /> Allowance No. Up/A-1; Removal and Replacement of Existing Metal Roof Deck: <br /> Allow an amount per square foot for removal and replacement of existing metal roof deck with new metal roof <br /> deck based on the unit price for removal and replacement of existing metal roof deck quoted in the Proposal. <br /> Quantity: 750 SF <br /> <br /> Allowance No. Up/A-2; Restoration of Metal Roof Deck: <br /> Allow an amount per square foot for restoration of existing metal roof deck quoted in the Proposal. <br /> Quantity: 1000 SF <br /> <br /> Allowance No. Up/A-3; Metal Deck Roof Repair: <br /> Allow an amount per square foot for repair of existing metal roof deck quoted in the Proposal. <br /> Quantity: 100 SF <br /> <br /> Allowance No. Up/A-4; Wood Blocking Replacement: <br /> Allow an amount per board foot for replacement of existing wood blocking quoted in the Proposal. <br /> Quantity: 200 bd.ft <br /> <br />DocuSign Envelope ID: 17058488-BE46-4277-9E77-433E3054E269