Browse
Search
2021-439-E-AMS-Siemens Industry-Southern Human Services HVAC Controls
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-439-E-AMS-Siemens Industry-Southern Human Services HVAC Controls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 3:03:35 PM
Creation date
8/9/2021 3:00:16 PM
Metadata
Fields
Template:
Contract
Date
8/5/2021
Contract Starting Date
8/5/2021
Contract Ending Date
8/7/2021
Contract Document Type
Agreement
Amount
$205,450.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br /> <br />ALLOWANCES 01 21 00 - 3 <br />C. Change orders prepared to return unused allowance amounts to the Owner shall be subject to the same <br />requirements for the return of appropriate profit and overhead as other change orders in accordance with <br />the Conditions of the Contract. Where the Contractor has been directed not to include his related costs <br />(profit and overhead) in the Contract Sum for contingency allowances, the return of profit and overhead <br />shall not be excepted. <br />1.8 UNUSED MATERIALS <br />A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, <br />after installation has been completed and accepted. <br />1. If requested by Architect, prepare unused material for storage by Owner when it is not <br />economically practical to return the material for credit. If directed by Architect, deliver unused <br />material to Owner's storage space. Otherwise, disposal of unused material is Contractor's <br />responsibility. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged <br />or defective products to manufacturer for replacement. <br />3.2 PREPARATION <br />A. Coordinate materials and their installation for each allowance with related materials and installations to <br />ensure that each allowance item is completely integrated and interfaced with related work. <br />3.3 SCHEDULE OF ALLOWANCES <br /> <br /> Allowance No. Up/A-1; Removal and Replacement of Existing Metal Roof Deck: <br /> Allow an amount per square foot for removal and replacement of existing metal roof deck with new metal roof <br /> deck based on the unit price for removal and replacement of existing metal roof deck quoted in the Proposal. <br /> Quantity: 750 SF <br /> <br /> Allowance No. Up/A-2; Restoration of Metal Roof Deck: <br /> Allow an amount per square foot for restoration of existing metal roof deck quoted in the Proposal. <br /> Quantity: 1000 SF <br /> <br /> Allowance No. Up/A-3; Metal Deck Roof Repair: <br /> Allow an amount per square foot for repair of existing metal roof deck quoted in the Proposal. <br /> Quantity: 100 SF <br /> <br /> Allowance No. Up/A-4; Wood Blocking Replacement: <br /> Allow an amount per board foot for replacement of existing wood blocking quoted in the Proposal. <br /> Quantity: 200 bd.ft <br /> <br />DocuSign Envelope ID: 17058488-BE46-4277-9E77-433E3054E269
The URL can be used to link to this page
Your browser does not support the video tag.