Orange County NC Website
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br /> <br />THERMOPLASTIC MEMBRANE ROOFING 07 54 00 - 6 <br />c. Length: 8 feet. <br />d. Weight: 2.55 lb/sq. ft. <br />e. Surfacing: Fiberglass mat with non-asphaltic coating. <br />f. Flexural Strength, Parallel (ASTM C473): 100 lbf, minimum. <br />g. Flute Span (ASTM E661): 8 inches. <br />h. Permeance (ASTM E96): Not more than 32 perms. <br />i. R-Value (ASTM C518): Not less than 0.67. <br />j. Water Absorption (ASTM C1177): Less than 10 percent of weight. <br />k. Compressive Strength (Applicable Sections of ASTM C472): 500 - 900 pounds per square inch. <br />l. Surface Water Absorption (ASTM C473): Not more than 2 grams. <br />2. Acceptable Products: <br />a. DensDeck Prime, Georgia-Pacific Gypsum or equal <br />B. Fasteners: <br />1. At Existing Metal Decking: Factory-coated steel fasteners and metal or plastic plates meeting <br />corrosion-resistance provisions in FMG 4470, designed for fastening substrate panel to roof deck. <br />Fasteners shall be designed to meet all uplift loading conditions. At a minimum, provide (24) <br />fasteners per 4’x8’ dimension for the entire roof section and (32) fasteners per 4’x8’ dimension 4’- <br />0” from the perimeter of the roof. <br />2. At Existing Concrete Decking: Install with Low rise foam adhesive <br />Products: Basis of Design: Carlisle Syntec, Inc-Fast Dual Tank Adhesive <br />a. Approved equals by Firestone or John’s Manville. <br />3. Install adhesive and insulation in strict compliance with manufacturer’s instructions to meet wind <br />load requirements. <br />2.5 ACCESSORIES <br />A. Protection Mat: Woven or nonwoven polypropylene, polyolefin, or polyester fabric mat, water <br />permeable and resistant to ultraviolet degradation, type and weight as recommended by roofing system <br />manufacturer for application. Location as shown on the drawings. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following <br />requirements and other conditions affecting performance of roofing system: <br />1. Verify that roof openings and penetrations are in place and set and braced and that roof drains are <br />securely clamped in place. <br />2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations <br />and terminations and that nailers match thicknesses of insulation. <br />3. Verify that surface plane flatness and fastening of steel roof deck comply with requirements in <br />Division 05 Section "Steel Decking." <br />4. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation <br />according to roofing system manufacturer's written instructions. Remove sharp projections. <br />DocuSign Envelope ID: 17058488-BE46-4277-9E77-433E3054E269