Browse
Search
2021-439-E-AMS-Siemens Industry-Southern Human Services HVAC Controls
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-439-E-AMS-Siemens Industry-Southern Human Services HVAC Controls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 3:03:35 PM
Creation date
8/9/2021 3:00:16 PM
Metadata
Fields
Template:
Contract
Date
8/5/2021
Contract Starting Date
8/5/2021
Contract Ending Date
8/7/2021
Contract Document Type
Agreement
Amount
$205,450.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />Addendum 2 ADD 2-1 <br /> <br />ADDENDUM 2 <br /> <br />ADDENDUM DATE: March 11th, 2021 <br /> <br />PROJECT: Orange County SHSC Roof and HVAC Replacement <br /> <br />OWNER: Orange County <br /> 300 West Tryon St. <br /> Hillsborough NC, 27278 <br /> <br />ARCHITECT: Smith Sinnett Architecture, P.A. <br /> 4600 Lake Boone Trail, Suite 205 <br /> Raleigh, North Carolina 27607 <br /> <br />BIDS DUE: Thursday March 18th, 2021 at 3:00 p.m. <br /> Orange County Office <br /> 405 Meadowlands Drive, <br /> Hillsborough, NC 27278 <br /> <br />This Addendum shall be included in the contract for the above referenced project. All General, <br />Supplementary and Special Conditions, etc., as originally specified or as modified below shall apply to these <br />items. <br /> <br />General <br />1. The period for questions and request for substitutions has ended. <br />2. Clarification: Roof drain bodies are to be replaced throughout. <br />3. Clarification: All existing parapet coping is to be replaced with new. <br />4. Clarification: Masonry control joint replacement is not included in the scope of work. <br />5. Clarification: The roof of the detached boiler plant is to be replaced in the same manner as main <br />building. See plans. <br />6. Clarification: Regarding on site storage – space will be determined for staging in the parking lot at <br />the front of the building. Enclosed/secured storage is the responsibility of the contractor. <br />7. Clarification: Temporary facilities will be required. Building restrooms are off-limits. <br />8. A commissioning authority has not been selected for the project yet. <br />9. Light fixtures are not included within the project scope other than those damaged during <br />construction. These will be replaced in kind and are the responsibility of the contractor. <br />10. Any new ceiling tile/grid, hard ceiling, bulkheads required to be replaced due to above ceiling <br />activity are to be accounted for in base bid. These materials are to be replaced in kind. <br />DocuSign Envelope ID: 17058488-BE46-4277-9E77-433E3054E269
The URL can be used to link to this page
Your browser does not support the video tag.