Orange County NC Website
<br />Revised 07/20 <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE SHSC HVAC Controls <br /> FY 2020-2021 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 21st <br />day of June, 2021, by and between Simens Industry, Inc. , (hereinafter called the “Contractor”), and <br />Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Smith Sinnett Architecture (Sheet G0-01, G0-02, S1- <br />01, A0-01, A0-02, A1-01, A5-01, M0-00, M0-01, M0-02, M0-03, M1-01, M1-03, M2-01, <br />M3-01, M5-01, M5-02, M5-03, M6-01, M6-02. M6-03. M7-01, E0-00, E0-01, E2-01, E2- <br />02, E4-01, E5-01 dated 1/29/2021, SHSC Roof and HVAC Specifications dated <br />Addendum 1 dated 3/8/2021, Addendum 2 dated 3/11/2021, Addendum 3 dated 3/15/2021 <br />and Addendum 4 dated 3/17/2021) <br /> <br />b. Written specifications prepared by the project engineer. <br /> <br />c. Siemens Industry, Inc. 0063V000006ycFmQAI proposal dated March 30, 2021 which <br />fully describes the work to be performed. Such work will hereafter be called the “Work”. <br />DocuSign Envelope ID: 17058488-BE46-4277-9E77-433E3054E269