<br />Revised 07/20
<br />
<br />1
<br /> [Departmental Use Only]
<br /> TITLE SHSC HVAC Controls
<br /> FY 2020-2021
<br />NORTH CAROLINA
<br /> CONSTRUCTION AGREEMENT UNDER $250,000.00
<br />ORANGE COUNTY
<br />
<br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 21st
<br />day of June, 2021, by and between Simens Industry, Inc. , (hereinafter called the “Contractor”), and
<br />Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,”
<br />“Orange County,” or “Owner”).
<br />
<br />W I T N E S S E T H:
<br />
<br /> That the Contractor and the Owner, for the consideration herein named, agree as follows:
<br />
<br />
<br />1. CONTRACT DOCUMENTS; PRIORITY
<br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal,
<br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the
<br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be
<br />interpreted in the following order of priority:
<br />
<br />a. This Agreement.
<br />
<br />b. Designer Approved Bulletins and Field Orders.
<br />
<br />c. Request for Proposals and addenda thereto.
<br />
<br />d. Proposal.
<br />
<br />
<br />2. SCOPE OF WORK
<br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work
<br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be
<br />executed by the Contractor and Owner and in accordance with the following enumerated documents,
<br />which are made a part hereof as if fully contained herein:
<br />
<br />a. Construction Drawings prepared by Smith Sinnett Architecture (Sheet G0-01, G0-02, S1-
<br />01, A0-01, A0-02, A1-01, A5-01, M0-00, M0-01, M0-02, M0-03, M1-01, M1-03, M2-01,
<br />M3-01, M5-01, M5-02, M5-03, M6-01, M6-02. M6-03. M7-01, E0-00, E0-01, E2-01, E2-
<br />02, E4-01, E5-01 dated 1/29/2021, SHSC Roof and HVAC Specifications dated
<br />Addendum 1 dated 3/8/2021, Addendum 2 dated 3/11/2021, Addendum 3 dated 3/15/2021
<br />and Addendum 4 dated 3/17/2021)
<br />
<br />b. Written specifications prepared by the project engineer.
<br />
<br />c. Siemens Industry, Inc. 0063V000006ycFmQAI proposal dated March 30, 2021 which
<br />fully describes the work to be performed. Such work will hereafter be called the “Work”.