Browse
Search
2021-422-E-AMS-Facility Dynamic Engineering Corporation-Northern Campus Added scope for the smoke control sequence commissioning
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-422-E-AMS-Facility Dynamic Engineering Corporation-Northern Campus Added scope for the smoke control sequence commissioning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:42:58 PM
Creation date
8/3/2021 3:42:43 PM
Metadata
Fields
Template:
Contract
Date
7/28/2021
Contract Starting Date
7/28/2021
Contract Ending Date
8/2/2021
Contract Document Type
Contract
Amount
$3,117.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 | P a g e <br /> <br />The following is a breakdown of our costs for each Building: <br /> <br />TASK ITEM FEES <br />1 Detention Center $ 81,020 <br />2 EAC Building $ 19,127 <br />3 Parks Operations Building $ 12,786 <br />Total $ 112,933 <br /> <br />The following overall clarifications are noted relative to the above fee and scope proposals. <br /> <br />1. Facility Dynamics will develop checklists and functional tests based on their <br />experience for systems of these types. <br />2. Facility Dynamics will coordinate the certification of contractors for readiness, <br />completion of installation, prestart and startup. <br />3. Testing reports will be included that document the FPT’s tested. Additional retesting <br />for failed tests will be limited to the allowance above or considered an extra service. <br />4. Facility Dynamics assumes that the general contractor (and its Subcontractors, as <br />applicable) will contribute the appropriate Trade Specialists to participate in all <br />required startup tests/checks and FPT’s where appropriate. <br />5. This fee includes the use of our commissioning software tool (CACEA) to manage <br />much of the information necessary for Commissioning electronically. <br /> <br />Feel free to contact me if you need any further information or breakdown of costs. We would be <br />glad to meet with you or any other staff to review our detailed cost estimate and scope for this <br />project. <br /> <br />Sincerely, <br /> <br />FACILITY DYNAMICS ENGINEERING CORPORATION <br /> <br /> <br /> <br />Kevin D. Shortt, PE <br />DocuSign Envelope ID: 12BDD0F0-7FBF-43B6-BACD-F124F87E24FA
The URL can be used to link to this page
Your browser does not support the video tag.