Orange County NC Website
3 | P a g e <br /> <br />Parks Operations Base <br />• Lighting Control <br />• PV System <br />• MTS setup and test with Mobile Generator <br />• Panelboards/ Switchboards <br /> <br />4) Plumbing <br />Detention Center <br />• Domestic Water Heating System (Geo + 4-NG Instant) <br />• Mixing Valves/ Recirc Pumps <br />• Water Pressure Booster System <br /> <br />Environment & Ag Center <br />• Solar Water Heater System + EWH <br />• Miscellaneous Tempering Valves <br /> <br />Parks Operations Base <br />• Domestic Water Heating System) <br /> <br />2) Retesting allowance (6 man-days) <br />3) Documentation all functional testing <br />4) Maintain and Update Action Item List – Assist in resolution <br />5) Attend/ Conduct Cx Progress Meetings (5 budgeted) <br />6) Prepare Final Commissioning report. <br /> <br />TASK 3 – Post Acceptance Phase <br /> <br />1) Perform Opposite Season Testing, Trend Review, etc. <br />2) Update Cx report <br />3) End of Warranty Site Visit (~10 months from completion). <br />4) Prepare End of Warranty Site Visit <br /> <br /> <br />FEES <br /> <br />The following is a breakdown of our costs for each phase: <br /> <br />TASK ITEM FEES <br />1 Execution Phase $ 28,076 <br />2 Acceptance Phase $ 80,030 <br />3 Post-Acceptance Phase $ 4,827 <br />Total $ 112,933 <br /> <br />DocuSign Envelope ID: 12BDD0F0-7FBF-43B6-BACD-F124F87E24FA