Browse
Search
2021-422-E-AMS-Facility Dynamic Engineering Corporation-Northern Campus Added scope for the smoke control sequence commissioning
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-422-E-AMS-Facility Dynamic Engineering Corporation-Northern Campus Added scope for the smoke control sequence commissioning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:42:58 PM
Creation date
8/3/2021 3:42:43 PM
Metadata
Fields
Template:
Contract
Date
7/28/2021
Contract Starting Date
7/28/2021
Contract Ending Date
8/2/2021
Contract Document Type
Contract
Amount
$3,117.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 | P a g e <br /> <br />• RTUs (2ea) <br />• Gas Fired Unit Heater (2ea) <br />• Electric Unit Heater/ Electric Wall Heater (5ea) <br />• Water Source Heat Pump (17 ea) <br />• Water-to-Water Heat Pump / System <br />• Split System Unit <br />• Ductless Split System Unit (3ea) <br />• Misc. Exhaust Fans (9ea) <br />• Smoke Exhaust/ Supply Fans (31 ea) <br />• MAU-1/ Kitchen Hood <br />• Fire Alarm / Smoke Control Sequences {added to scope ver.20200828} <br /> <br />Environment & Ag Center <br />• RTU-1 <br />• VAV Terminal Units (32 ea) <br />• Ductless Split System Unit (2 ea) <br />• Misc. Exhaust Fans (6 ea) <br />• Electric Unit Heater (3ea) <br /> <br />Parks Operations Base <br />• H&V Unit <br />• Packaged Heat Pump (2ea) <br />• Infrared Heaters (3 ea) <br />• Misc. Exhaust Fans (10 ea) <br /> <br /> <br />2) TAB Verification <br />• Review TAB reports, select 20% sample (typical for all 3 buildings) <br /> <br /> <br />3) Electrical <br />Detention Center <br />• Emergency Generator <br />• ATS Switches (3ea @ 100%) <br />• Building Loss of Power (incl. verification of E.P. systems) <br />• UPS <br />• Exterior Lighting Control/ Occ Sensor controlled lighting <br />• Panelboards/ Switchboards <br /> <br />Environment & Ag Center <br />• Lighting Control <br />• PV System <br />• MTS setup and test with Mobile Generator <br />• Panelboards/ Switchboards <br /> <br />DocuSign Envelope ID: 12BDD0F0-7FBF-43B6-BACD-F124F87E24FA
The URL can be used to link to this page
Your browser does not support the video tag.