Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />Addendum 2 ADD 2-2 <br />11. The existing Fire Alarm system is inspected, serviced and repaired by First Fire: Chris Register <br />919.830.6546 <br />12. Building water and electric service charges shall not implemented. These are available for use at <br />no charge. <br />13. A site enclosure fence is not required, however, the contractor is responsible for the security and <br />safety of their on-site equipment and stored materials. Contractor is also required to provide <br />pedestrian protection as this building will be occupied while work is occurring. A temporary <br />barrier/wall will be needed between phase areas. Refer to new drawing sheet G0-03. <br />Request for Substitutions <br />Manufacturers are required to submit products which meet the specifications. Those products which do not <br />comply may be rejected in the submittal stage of the project. <br /> <br />1. 075419.02 Thermoplastic Membrane Roofing- PVC Membrane – Duro-Last is to be added to the <br />list of approved equal manufacturers. <br />Specifications <br />1. Revised - 075419.02 Thermoplastic Membrane Roofing- PVC Membrane. See attached. Section <br />2.2 has been revised to allow KEE modified PVC membranes. <br />2. Clarification: 01 71 23 – A land surveyor will not be required for the project. <br />Drawings <br />1. New Sheet: G0-03 Phasing/Life Safety Plan has been added to the bid documents. See attached. <br />2. Revised: G0-01 Coversheet – Add G0-03 to the drawing index <br /> <br /> <br /> <br />End of Addendum 2 <br /> <br />Attached: <br />Specifications; 075419.02 <br />Drawings: G0-03 Phasing/Life Safety Plan <br /> <br /> <br /> <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.