Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />VAV PACKAGED DX RTU 23 74 00 - 6 <br />PART 3 EXECUTION <br />3.01 INSTALLATION,OPERATION,AND MAINTENANCE <br />A.Installation,Operation,and Maintenance manual shall be supplied with the unit. <br />B.Examine areas and conditions,with Installer present,for compliance with requirements for <br />installation tolerances and other conditions affecting performance of the Work. <br />C.Examine casing insulation materials and filter media before air-to-air energy recovery equipment <br />installation.Reject insulation materials and filter media that do not comply,or are wet,moisture <br />damaged,or mold damaged. <br />D.Install units with clearances for service and maintenance. <br />E.Manufacturer's Field Service:Engage a factory-authorized service representative to inspect,test, <br />and adjust components,assemblies,and equipment installations,including connections. <br />F.Engage a factory-authorized service representative to train Owner's maintenance personnel to <br />adjust,operate,and maintain air-to-air energy recovery units. <br />G.Installing contractor shall install unit,including field installed components,in accordance with <br />Installation,Operation,and Maintenance manual instructions. <br />H.Start up and maintenance requirements shall be complied with to ensure safe and correct <br />operation of the unit. <br />END OF SECTION <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.