Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />HVAC Ducts and Casings 23 31 00 - 5 <br />4.Butyl rubber gasket must be applied per the manufacturer’s instructions on all connections <br />except for breakaway connections.Closed Cell Neoprene gasket must be applied per the <br />manufacturer’s instructions on all breakaway connections.No substitution of connector <br />system components or gaskets is permitted. <br />5.All duct installed using engineered connectors must adhere to the manufacturer’s published <br />assembly and installation guidelines for all standard,breakaway,roof-top or specialty <br />connections unless otherwise specified. <br />B.Formed-on Flanges: <br />1.Lockformers TDC or Engles TDF may be used in accordance with T-25 flanges of SMACNA <br />HVAC Duct Construction Standards,provided that corner pieces with bolts are used. If <br />TDF/TDC flanges are damaged,replace the damaged joint(s)by straightening and reinforcing <br />with minimum 1-1/2 x 1-1/2 x 1/4 angle at each side of transverse joint <br />PART 3 EXECUTION <br />3.01 INSTALLATION <br />A.Install,support,and seal ducts in accordance with SMACNA (DCS). <br />B.During construction provide temporary closures of metal or taped polyethylene on open ductwork <br />to prevent construction dust from entering ductwork system. <br />C.Install ductwork parallel to building walls and ceilings and at such heights not to obstruct any <br />portion of window,doorway,stairway,or passageway. Install ductwork to allow adequate access <br />and service space for equipment and access clearances for cable tray/j-hooks.Refer to drawings <br />and/or manufacturer's recommendations Install vertical ductwork plumb. Make allowances for <br />beams,pipes or other obstructions in building construction and for work of other contractors. <br /> Check plans showing work of other trades and consult with Engineer in event of any interference. <br />D.Where interferences develop in the field,offset or reroute ductwork as required to clear such <br />interferences. Do not divide duct and do not route any other utilities such as piping or conduit <br />through duct. In all cases,consult drawings for exact location of space allocated for duct,ceiling <br />heights,door and window openings,or other architectural details before fabricating or installing <br />duct. Consult Designer where conflicts arise between ductwork and other utilities which cannot be <br />resolved by relocating duct. <br />E.Where offsets in ductwork are required,contractor to use standard 30,45 or 90-degree elbows. <br /> Where space constraints do not allow for the use of standard elbows for offsets,use of angled <br />offsets as depicted by SMACNA Figure 2-7 (Angled Offset Type 1)may be used with maximum <br />angle of offset not to exceed 15 degrees maximum.Offsets Type 2 and 3 in SMACNA Figure 2-7 <br />shall not be allowed. <br />F.Rectangular Duct Elbows: <br />1.Rectangular Duct:Unless specific type is indicated,provide radius elbows with splitter vanes <br />with minimum centerline radius to width or diameter ratio of 1.5 <br />a.1.5 radius elbows with full spliter vanes as follows: <br />1)One vane for duct width 2-12" <br />2)Two vanes for duct width 13-20" <br />3)Three vanes for duct width 21"-36" <br />4)Four vanes for duct width 38"and larger <br />5)Fabricate vanes in accordance with SMACNA. <br />b.Rectangular throad elbows with turning vanes where 1.5 radius elbows do not fit. <br />c.Rectangular throat/radius heel elbows or rectangular elbows without turning vanes shall <br />not be used. <br />G.Round and Oval Duct Elbows: <br />1.Unless specific type is indicated,use radius elbows with centerline radius to diameter ratio of <br />1.5.ONLY where1.5 radius elbows do not fit,1.0 radius elbows may be used if approved by <br />the Engineer. <br />H.Construct ductwork so that interior surfaces are smooth. Internal duct hangers and internal <br />bracing are not allowed. Refer to above for internal tie rods. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.