Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />HVAC Water Treatment 23 25 00 - 3 <br />B.Hot Water Heating Systems (use the more stringent between the method below and <br />manufacturer's recommended method): <br />1.Apply heat while circulating,slowly raising temperature to 160 degrees F and maintain for 12 <br />hours minimum. <br />2.Remove heat and circulate to 100 degrees F or less;drain systems as quickly as possible <br />and refill with clean water. <br />3.Circulate for 6 hours at design temperatures,then drain. <br />4.Refill with clean water and repeat until system cleaner is removed. <br />C.Use neutralizer agents on recommendation of system cleaner supplier and approval of Engineer <br />and Owner. <br />D.Remove,clean,and replace strainer screens. <br />E.Inspect,remove sludge,and flush low points with clean water after cleaning process is completed. <br /> Include disassembly of components as required. <br />F.After the precleaning is complete,test by the water treatment consultant shall confirm and a written <br />report shall certify the completeness of the precleaning by meeting the following minimum <br />requirements: <br />3.03 INSTALLATION <br />A.Install in accordance with manufacturer's instructions. <br />3.04 CLOSED SYSTEM TREATMENT <br />A.Introduce closed system treatment through bypass feeder when required or indicated by test. <br />B.Provide 3/4 inch water coupon rack around circulating pumps with space for 4 test specimens. <br />3.05 CLOSEOUT ACTIVITIES <br />A.Training: Train Owner's personnel on operation and maintenance of chemical treatment system. <br />1.Provide minimum of four hours of instruction for two people. <br />2.Have operation and maintenance data prepared and available for review during training. <br />3.Conduct training using actual equipment after treated system has been put into full operation. <br />B.Written completeness certification and applicable reports will be forwarded to the project Engineer <br />prior to acceptance. <br />3.06 MAINTENANCE <br />A.Provide service and maintenance of treatment systems for one year from Date of Substantial <br />Completion. <br />B.Provide monthly technical service visits to perform field inspections and make water analysis on- <br />site. Detail findings in writing on proper practices,chemical treating requirements,and corrective <br />actions needed. Submit two copies of field service report after each visit. <br />C.Provide laboratory and technical assistance services during this maintenance period. <br />D.Provide on-site inspections of equipment during scheduled or emergency shutdown to properly <br />evaluate success of water treatment program,and make recommendations in writing based upon <br />these inspections. <br />END OF SECTION <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.