Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />PROPOSAL FORMS Proposal - 3 <br />SINGLE PRIME CONTRACT: <br /> <br />BASE BID: <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br />ALTERNATE 2: Ductwork Cleaning <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br /> <br />MAJOR SUBCONTRACTORS if any (Name, City & State) <br /> <br />General Subcontractor: Roofing Subcontractor: <br /> <br /> Lic Lic <br /> <br />Mechanical Subcontractor: Electrical Subcontractor: <br /> <br /> Lic Lic <br /> <br /> <br />GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is <br />accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed <br />subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a <br />contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the contractor. <br /> <br /> <br /> <br />ALLOWANCES - (Refer to Division 01 Section 01 21 00 – Allowances for amounts to be included in bid shall <br />be based on the Unit Prices provided as part of Section 01 22 00) Acknowledge Allowances have been included with <br />in the Base Bid. <br /> <br />UP/A-1 No.A-2 _________ <br /> <br /> <br />UNIT PRICES - (Refer to Division 01 Section 01 22 00 - Unit Prices for Quantities) <br />Unit prices quoted and accepted shall apply throughout the life of the contract, except as otherwise specifically <br />noted. Unit prices shall be applied, as appropriate, to compute the total value of changes in the base bid quantity of <br />the work and in the given Allowances all in accordance with the contract documents. <br /> <br /> <br />Unit Price No. UP/A-1; Metal roof deck replacement per sf. – 750sf Unit Price ($) <br /> <br />The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a <br />written order of the designer and shall fully complete all work thereunder within the time specified in the <br />Supplementary General Conditions Article 9. Applicable liquidated damages amount is also stated in the <br />Supplementary General Conditions Article 9. <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.