Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />Commissioning of HVAC 23 08 00 - 5 <br />12.Occupancy sensors and controls. <br />13.All control strategies and sequences not tested during controlled equipment testing. <br />H.If the control system,integral control components,or related equipment do not respond to <br />changing conditions and parameters appropriately as expected,as specified and according to <br />acceptable operating practice,under any of the conditions,sequences,or modes tested,correct all <br />systems,equipment,components,and software required at no additional cost to Owner. <br />3.05 OPERATION AND MAINTENANCE MANUALS <br />A.See Section 01 78 00 for additional requirements. <br />B.Add design intent documentation furnished by Architect to manuals prior to submission to Owner. <br />C.Submit manuals related to items that were commissioned to Commissioning Authority for review; <br />make changes recommended by Commissioning Authority. <br />D.Commissioning Authority will add commissioning records to manuals after submission to Owner. <br />3.06 DEMONSTRATION AND TRAINING <br />A.See Section 01 79 00 for additional requirements. <br />B.Demonstrate operation and maintenance of HVAC system to Owner'personnel;if during any <br />demonstration,the system fails to perform in accordance with the information included in the O&M <br />manual,stop demonstration,repair or adjust,and repeat demonstration. Demonstrations may be <br />combined with training sessions if appropriate. <br />C.These demonstrations are in addition to,and not a substitute for,Prefunctional Checklists and <br />demonstrations to the Commissioning Authority during Functional Testing. <br />D.TAB Review: Instruct Owner's personnel for minimum 4 hours,after completion of TAB,on the <br />following: <br />1.Review final TAB report,explaining the layout and meanings of each data type. <br />2.Discuss any outstanding deficient items in control,ducting or design that may affect the <br />proper delivery of air or water. <br />3.Identify and discuss any terminal units,duct runs,diffusers,coils,fans and pumps that are <br />close to or are not meeting their design capacity. <br />4.Discuss any temporary settings and steps to finalize them for any areas that are not finished. <br />5.Other salient information that may be useful for facility operations,relative to TAB. <br />E.HVAC Control System Training: Perform training in at least three phases: <br />1.Phase 1 -Basic Control System: Provide minimum of 8 hours of actual training on the control <br />system itself. Upon completion of training,each attendee,using appropriate documentation, <br />should be able to perform elementary operations and describe general hardware architecture <br />and functionality of the system. <br />a.This training may be held on-site. <br />2.Phase 2 -Integrating with HVAC Systems: Provide minimum of 8 hours of on-site,hands-on <br />training after completion of Functional Testing. Include instruction on: <br />a.The specific hardware configuration of installed systems in this facility and specific <br />instruction for operating the installed system,including interfaces with other systems,if <br />any. <br />b.Security levels,alarms,system start-up,shut-down,power outage and restart routines, <br />changing setpoints and alarms and other typical changed parameters,overrides,freeze <br />protection,manual operation of equipment,optional control strategies that can be <br />considered,energy savings strategies and set points that if changed will adversely affect <br />energy consumption,energy accounting,procedures for obtaining vendor assistance, <br />etc. <br />c.Trend logging and monitoring features (values,change of state,totalization,etc.), <br />including setting up,executing,downloading,viewing both tabular and graphically and <br />printing trends;provide practice in setting up trend logging and monitoring during training <br />session. <br />d.Every display screen,allowing time for questions. <br />e.Setting up and changing an air terminal unit controller. <br />f.Point database entry and modifications. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6