Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />Commissioning of HVAC 23 08 00 - 2 <br />C.Startup Reports,Prefunctional Checklists,and Trend Logs: Submit for approval of Commissioning <br />Authority. <br />D.HVAC Control System O&M Manual Requirements. In addition to documentation specified <br />elsewhere,compile and organize at minimum the following data on the control system: <br />1.Specific step-by-step instructions on how to perform and apply all functions,features,modes, <br />etc.mentioned in the controls training sections of this specification and other features of this <br />system. Provide an index and clear table of contents. Include the detailed technical manual <br />for programming and customizing control loops and algorithms. <br />2.Full as-built set of control drawings. <br />3.Full as-built sequence of operations for each piece of equipment. <br />4.Full points list;in addition to the information on the original points list submittal,include a <br />listing of all rooms with the following information for each room: <br />a.Floor. <br />b.Room number. <br />c.Room name. <br />d.Air handler unit ID. <br />e.Reference drawing number. <br />f.Air terminal unit tag ID. <br />g.Heating and/or cooling valve tag ID. <br />h.Minimum air flow rate. <br />i.Maximum air flow rate. <br />5.Full print out of all schedules and set points after testing and acceptance of the system. <br />6.Full as-built print out of software program. <br />7.Electronic copy on disk of the entire program for this facility. <br />8.Marking of all system sensors and thermostats on the as-built floor plan and HVAC drawings <br />with their control system designations. <br />9.Maintenance instructions,including sensor calibration requirements and methods by sensor <br />type,etc. <br />10.Control equipment component submittals,parts lists,etc. <br />11.Warranty requirements. <br />12.Copies of all checkout tests and calibrations performed by the Contractor (not commissioning <br />tests). <br />13.Organize and subdivide the manual with permanently labeled tabs for each of the following <br />data in the given order: <br />a.Sequences of operation. <br />b.Control drawings. <br />c.Points lists. <br />d.Controller and/or module data. <br />e.Thermostats and timers. <br />f.Sensors and DP switches. <br />g.Valves and valve actuators. <br />h.Dampers and damper actuators. <br />i.Program setups (software program printouts). <br />E.Project Record Documents: See Section 01 78 00 for additional requirements. <br />1.Submit updated version of control system documentation,for inclusion with operation and <br />maintenance data. <br />2.Show actual locations of all static and differential pressure sensors (air,water and building <br />pressure)and air-flow stations on project record drawings. <br />F.Draft Training Plan: In addition to requirements specified in Section 01 79 00,include: <br />1.Follow the recommendations of ASHRAE Guideline 1.1. <br />2.Control system manufacturer's recommended training. <br />3.Demonstration and instruction on function and overrides of any local packaged controls not <br />controlled by the HVAC control system. <br />G.Training Manuals: See Section 01 79 00 for additional requirements. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.