Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />Testing,Adjusting,and Balancing for HVAC <br /> 23 05 93 - 5 <br />M.Measure building static pressure and adjust supply,return,and exhaust air systems to provide <br />required relationship between each to maintain approximately 0.05 inches positive static pressure <br />near the building entries. <br />N.For variable air volume system powered units set volume controller to air flow setting indicated. <br /> Confirm connections properly made and confirm proper operation for automatic variable air <br />volume temperature control. <br />O.Single-duct,dual-duct,and fa-powered VAV boxes shall be calibrated using a multi-point <br />calibration approach.Single-point calibration will not be acceptable. <br />P.The TAB report shall indicate the critical VAV box and how the static pressure set point was <br />estalished. <br />3.07 WATER SYSTEM PROCEDURE <br />A.Adjust water systems to provide design quantities. <br />B.Use calibrated Venturi tubes,orifices,or other metered fittings and pressure gages to determine <br />flow rates for system balance. Where flow metering devices are not installed,base flow balance <br />on temperature difference across various heat transfer elements in the system. <br />C.Adjust systems to provide specified pressure drops and flows through heat transfer elements prior <br />to thermal testing. Perform balancing by measurement of temperature differential in conjunction <br />with air balancing. <br />D.Effect system balance with automatic control valves fully open to heat transfer elements. <br />E.Effect adjustment of water distribution systems by means of balancing cocks,valves,and fittings. <br /> Do not use service or shut-off valves for balancing unless indexed for balance point. <br />F.Where available pump capacity is less than total flow requirements or individual system parts,full <br />flow in one part may be simulated by temporary restriction of flow to other parts. <br />G.The TAB report shall indicate the critical circuit,which coils were closed for diversity (if applicable), <br />and how the differential pressure setpoint was established. <br />3.08 DEMONSTRATION <br />A.Training <br />1.Train the Owner's maintenance personnel on troubleshooting procedures and testing, <br />adjusting,and balancing procedures.Provide four (4)hours on site training.Review with the <br />Owner's personnel the information contained in the Operating and Maintenance Data <br />specified in Division 1 and Section 23 01 00. <br />2.Schedule training with the Owner through the Engineer with at least 7 days prior notice. <br />3.09 COMMISSIONING <br />A.Perform prerequisites prior to starting commissioning activities. <br />B.Fill out Prefunctional Checklists for: <br />1.Air side systems. <br />2.Water side systems. <br />C.Furnish to the Commissioning Authority,upon request,any data gathered but not shown in the <br />final TAB report. <br />D.Re-check minimum outdoor air intake flows and maximum and intermediate total airflow rates for <br />50 percent of the air handlers plus a random sample equivalent to 50 percent of the final TAB <br />report data as directed by Commissioning Authority. <br />1.Original TAB agency shall execute the re-checks,witnessed by the Commissioning Authority. <br /> <br />2.Use the same test instruments as used in the original TAB work. <br />3.Failure of more than 25 of the re-checked items of a given system shall result in the rejection <br />of the system TAB report;rebalance the system,provide a new system TAB report,and <br />repeat random re-checks. <br />4.For purposes of re-check,failure is defined as follows: <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.