Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />Vibration and Seismic Controls for HVAC <br /> 23 05 48 - 4 <br />b.Locate isolator hangers at top of hanger rods in accordance with manufacturer's <br />instructions. <br />3.Clean debris from beneath vibration-isolated equipment that could cause short-circuiting of <br />isolation. <br />4.Use elastomeric grommets for attachments where required to prevent short-circuiting of <br />isolation. <br />5.Adjust isolators to be free of isolation short circuits during normal operation. <br />6.Do not overtighten fasteners such that resilient material isolator pads are compressed beyond <br />manufacturer's maximum recommended deflection. <br />3.03 FIELD QUALITY CONTROL <br />A.Inspect vibration isolation and/or seismic control components for damage and defects. <br />B.Provide manufacturer representative or authorized technician services to assist with inspection <br />and testingof vibration isolation systems. Submit a detailed copy of manufacturer recommended <br />inspection and field reportprocedures. <br />C.Vibration Isolation Systems: <br />1.Verify isolator static deflections. <br />2.Verify vibration isolation performance during normal operation;investigate sources of <br />isolation short circuits. <br />D.Correct deficiencies and replace damaged or defective vibration isolation and/or seismic control <br />components. <br />END OF SECTION <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.