Southern Human Services Center Smith Sinnett /2020072
<br />HVAC and Roof Renovations Orange County,North Carolina
<br />Electrical Work 23 05 12 - 1
<br />SECTION 23 05 12
<br />ELECTRICAL WORK
<br />PART 1 GENERAL
<br />1.01 DIVISION OF WORK
<br />A.This Contractor shall be responsible for the final electrical and the entire control connections and
<br />wiring to all equipment installed as part of his contract.
<br />B.Contractor shall review the electrical plans,where applicable,to establish points of connection and
<br />the extent of his electrical work to be provided in his contract.
<br />C.Unless otherwise noted,this Contractor shall wire from his equipment to disconnect switches,
<br />junction boxes,or panelboard circuit breakers as provided by the Electrical Contractor or as
<br />required by the existing conditions.
<br />D.All power and control wiring shall be in conduits. Refer to electrical specifications for conduit and
<br />conduit fittings.
<br />E.All electrical work shall be performed by a licensed electrician.
<br />F.All electrical work shall be in accordance with the State Building Code and all its supplements,the
<br />latest edition of the National Electrical Code and the electrical specifications.
<br />PART 2 PRODUCT
<br />2.01 GENERAL REQUIREMENTS
<br />A.All motor starters,disconnects,switches,relays,conduits,conductors,etc.that are required for a
<br />complete electrical power and/or control system shall conform to the requirements set forth by
<br />NEC.
<br />B.Refer to the plans for the type,size and electrical characteristics of the starters,disconnects,
<br />switches,relays,conductor and conduits.
<br />C.All conductors and conduits shall be sized as noted on the plans or As required per NEC.
<br />D.All individual motor starters for mechanical equipment (i.e.,fans,pumps,etc.)shall be furnished
<br />and installed under Division 23.
<br />E.All relays,actuators,timers,seven-day clocks,alternators,pressure,vacuum,float,flow,
<br />pneumatic-electric,and electric-pneumatic switches,aquastats,freezestats,line and low voltage
<br />thermostats,thermals,remote selector switches,remote push-button stations,emergency break-
<br />glass stations,interlocking,disconnect switches beyond termination point,and other
<br />appurtenances associated with equipment under Division 23 shall be furnished,installed and wired
<br />under Division 23.
<br />PART 3 EXECUTION
<br />3.01 GENERAL REQUIREMENTS
<br />A.All motor starters,disconnects,and switches shall be installed on or as close to the equipment
<br />they are serving as possible,or where shown on the plans.
<br />B.Electrical connection to equipment subject to vibration which develops objectionable noises shall
<br />be made from the conduit system with short lengths of flexible "Liquid-Tite"conduit.Connection to
<br />other equipment shall be made with rigid conduit.
<br />C.Conduits shall be run in a concealed space such as wall cavities,ceiling cavities,etc.except in the
<br />mechanical rooms where conduit may be run exposed.
<br />END OF SECTION 23 05 12