Orange County NC Website
Southern Human Services Center Smith Sinnett /2020072 <br />HVAC and Roof Renovations Orange County,North Carolina <br />HVAC GENERAL PROVISIONS 23 01 00 <br />- 7 <br />2.Suggested setting of all controls and switches for normal operation,with description of control <br />and its location. <br />3.A check list for seasonal shutdown. <br />4.Maintenance and spare parts data for each major piece of equipment. <br />5.As-built wiring,interlock and control diagrams for equipment with color coding shown on <br />wiring and interlock diagrams. <br />6.Air and Water Balance Report. <br />B.The PDF shall be indexed,bookmarked,dated and signed by the Contractor when completed. <br />C.The operating and maintenance manuals shall be submitted to the Engineer for approval. When <br />the manuals are considered complete by the Engineer,they will be turned over to the Owner for <br />their permanent use. <br />END OF SECTION 23 01 00 <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6