Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 07/20 <br /> <br /> <br />3 <br />Any violation of the Orange County Non-Discrimination Policy is a breach of this Agreement <br />and County may immediately terminate this Agreement without further obligation on the part <br />of the County. This paragraph is not intended to limit and does not limit the definition of <br />breach to discrimination. <br /> <br />f. If activities related to the performance of this Agreement require specific licenses, <br />certifications, or related credentials Contractor represents that it and its employees, agents and <br />subcontractors engaged in such activities possess such licenses, certifications, or credentials <br />and that such licenses certifications, or credentials are current, active, and not in a state of <br />suspension or revocation. <br /> <br />g. The Contractor shall supervise and direct the Work efficiently and with the Contractor’s best <br />skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br />shall be solely responsible for the means, methods, techniques, sequences and procedures of <br />construction, and for safety precautions and programs in connection with the Work. The <br />Contractor shall be responsible to see that the finished Work complies accurately with the <br />Contract Documents. <br /> <br />h. The Contractor shall appoint a competent Project Manager with general authority to manage <br />the Project for the Contractor. The Contractor shall also keep on the Project at all times during <br />the Work of the Contractor a competent Resident Superintendent and necessary assistants who <br />shall not be replaced without prior written approval by the Designer or by the Owner if a <br />Designer is not retained for the Project. <br /> <br />i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br />unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br />Contract Price if and when directed by the Designer. <br /> <br />j. The Contractor shall attend all progress conferences and all other meetings or conferences. <br />The Contractor shall be represented at these pro gress conferences by a representative having <br />the authority of the Project Manager and by such other representatives as the Designer may <br />direct. <br /> <br />k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br />Contractor. Any Work in which untested materials are used without written approval or <br />written permission of the Owner or Designer shall be removed and replaced at Contractor’s <br />expense. <br /> <br />l. The Contractor shall obtain all necessary permits including all permits required t o complete the <br />Work in compliance with local, state, and federal law. <br /> <br />5. PAYMENT & TAXES <br /> <br />a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br />Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- <br />exceed One Million, Three Hundred Forty-Eight Thousand, Four Hundred Seventy-Nine <br />Dollars ($1,348,479.00)(Includes base contract and add alternate 1-duct cleaning). Not later <br />than the fifth (5th) day of each calendar month the Contractor shall submit to the Owner’s <br />Representative, generally the Designer if a Designer is retained on the Work, a Request for <br />Payment for work done during the previous calendar month. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.