Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />METAL SOFFIT AND WALL PANELS 07 41 13 - 5 <br />PART 2 - PRODUCTS <br />2.1 METAL SOFFIT MATERIALS <br />A. Flush-Profile. Preformed panel with concealed fasteners suitable for the required installation. Panels shall <br />be of a formed metal sheet with horizontal panel edges and flat pan with flush joints between panels, field <br />assembled with nested lapped edges, and attached to supports using concealed fasteners. <br />1. Basis of Design: PAC-CLAD Flush Series” Soffit System or approved equal <br />2. Material: Anodized Aluminum <br />3. Nominal Thickness: .032 Aluminum coated thickness, with smooth surface. <br />4. Color: As selected by Architect from manufacturer's standard colors. <br />5. Panel Width: 12 inches. <br />6. Panel Thickness: 1 1/2 inch. <br />7. Vent: Provide vented panels every fifth panel <br />2.2 MISCELLANEOUS MATERIALS <br />A. Panel Fasteners: Self-tapping screws, bolts, nuts, self-locking rivets and bolts, end-welded studs, and <br />other suitable fasteners designed to withstand design loads. Use stainless steel concealed fasteners. <br />2.3 FINISHES <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for <br />recommendations for applying and designating finishes. <br />B. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, <br />temporary protective covering before shipping. <br />C. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in <br />appearance of adjoining components are acceptable if they are within the range of approved Samples and <br />are assembled or installed to minimize contrast. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for <br />installation tolerances, metal panel supports, and other conditions affecting performance of the Work. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Clean substrates of substances harmful to insulation, including removing projections capable of <br />interfering with insulation attachment. <br />B. Miscellaneous Framing: Install sub-purlins, eave angles, furring, and other miscellaneous roof panel <br />support members and anchorage according to metal roof panel manufacturer's written instructions. <br />1. Soffit Framing: Secure furring to supports, as required to comply with requirements for <br />assemblies indicated. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.