Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />METAL SOFFIT AND WALL PANELS 07 41 13 - 4 <br />C. Stack metal roof panels on platforms or pallets, covered with suitable weathertight and ventilated <br />covering. Store metal roof panels to ensure dryness. Do not store metal roof panels in contact with other <br />materials that might cause staining, denting, or other surface damage. <br />D. Protect strippable protective covering on metal roof panels from exposure to sunlight and high humidity, <br />except to extent necessary for period of metal roof panel installation. <br />E. Protect foam-plastic insulation as follows: <br />1. Do not expose to sunlight, except to extent necessary for period of installation and concealment. <br />2. Protect against ignition at all times. Do not deliver foam-plastic insulation materials to Project site <br />before installation time. <br />3. Complete installation and concealment of plastic materials as rapidly as possible in each area of <br />construction. <br />1.8 PROJECT CONDITIONS <br />A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions <br />permit metal roof panel work to be performed according to manufacturer's written instructions and <br />warranty requirements. <br />B. Field Measurements: Verify actual dimensions of construction contiguous with metal roof panels by field <br />measurements before fabrication. <br />1.9 COORDINATION <br />A. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual <br />equipment provided. <br />B. Coordinate metal roof panels with rain drainage work, flashing, trim, and construction of decks, parapets, <br />walls, and other adjoining work to provide a leakproof, secure, and noncorrosive installation. <br />1.10 WARRANTY <br />A. Special Warranty: Manufacturer's custom form in which manufacturer agrees to repair or replace panels <br />that fail in materials or workmanship within specified warranty period. <br />1. Failures include, but are not limited to, the following: <br />a. Structural failures including rupturing, cracking, or puncturing. <br />b. Deterioration of metals, metal finishes, and other materials beyond normal weathering. <br />2. Warranty Period: 20 years from date of Substantial Completion. <br />B. Special Warranty on Panel Finishes: Manufacturer's custom form in which manufacturer agrees to repair <br />finish or replace metal roof panels, fascia panels, and wall panels that show evidence of deterioration of <br />factory-applied finishes within specified warranty period. <br />1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following: <br />a. Color fading more than 5 Hunter units when tested according to ASTM D 2244. <br />b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214. <br />c. Cracking, checking, peeling, or failure of paint to adhere to bare metal. <br />2. Finish Warranty Period: 20 years from date of Substantial Completion. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.