Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />METAL SOFFIT AND WALL PANELS 07 41 13 - 1 <br />SECTION 07 41 13 - METAL SOFFIT AND WALL PANELS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Metal soffit panels. <br /> <br />B. Related Sections: <br />1. Division 05 Section "Steel Decking" for steel roof deck supporting metal roof panels. <br />2. Division 05 Section "Structural Steel" for supporting metal roof panels. <br />3. Division 05 Section "Cold-Formed Metal Framing" for cold-formed metal framing supporting <br />metal roof panels. <br />4. Division 05 Section "Rough Carpentry" for wood framing and blocking supporting metal soffit <br />panels. <br />5. Division 07 Section "Sheet Metal Flashing and Trim" for and other sheet metal work not part of <br />metal soffit panel assemblies. <br />6. Division 07 Section "Joint Sealants" for field-applied sealants not otherwise specified in this <br />Section. <br />1.3 DEFINITIONS <br />A. Preformed Soffit: Preformed soffit is hereby defined to include panels which are structurally capable of <br />spanning between supports spaced as indicated. <br />B. Flush Wall Panel Assembly: Metal panels, attachment system components, miscellaneous metal framing, <br />thermal insulation, and accessories necessary for a complete weathertight wall panel and roofing system. <br />1.4 PERFORMANCE REQUIREMENTS <br />A. General Performance: Metal soffit panels shall comply with performance requirements without failure <br />due to defective manufacture, fabrication, installation, or other defects in construction. <br />B. Delegated Design: Design metal soffit and wall panel assembly, including comprehensive engineering <br />analysis by a qualified professional engineer, registered in the State of North Carolina, using performance <br />requirements and design criteria indicated. <br />C. Wind-Uplift Resistance: Provide metal soffit panel and metal wall panel assemblies that comply with <br />UL 580 for wind-uplift-resistance class indicated. <br />1. Uplift Rating: UL 120 or as required based on manufacturer’s engineering due to specified wind <br />speed.. <br />2. Wind Loads for roof, fascia, soffit and wall panels: Determine loads based on the following <br />minimum design wind pressures: <br />3. Ultimate wind speed 139 mph as listed in the North Carolina State Building Code 2018. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.