Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />OPERATION AND MAINTENANCE DATA 01 78 23 - 2 <br />1.5 COORDINATION <br />A. Where operation and maintenance documentation includes information on installations by more than one <br />factory-authorized service representative, assemble and coordinate information furnished by <br />representatives and prepare manuals. <br />PART 2 - PRODUCTS <br />2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY <br />A. Organization: Include a section in the directory for each of the following: <br />1. List of documents. <br />2. List of systems. <br />3. List of equipment. <br />4. Table of contents. <br />B. List of Systems and Subsystems: List systems alphabetically. Include references to operation and <br />maintenance manuals that contain information about each system. <br />C. List of Equipment: List equipment for each system, organized alphabetically by system. For pieces of <br />equipment not part of system, list alphabetically in separate list. <br />D. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance manual. <br />E. Identification: In the documentation directory and in each operation and maintenance manual, identify <br />each system, subsystem, and piece of equipment with same designation used in the Contract Documents. <br />If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of <br />Operating and Maintenance Documentation for Building Systems." <br />2.2 MANUALS, GENERAL <br />A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system <br />and subsystem, and a separate section for each piece of equipment not part of a system. Each manual <br />shall contain the following materials, in the order listed: <br />1. Title page. <br />2. Table of contents. <br />3. Manual contents. <br />B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information: <br />1. Subject matter included in manual. <br />2. Name and address of Project. <br />3. Name and address of Owner. <br />4. Date of submittal. <br />5. Name, address, and telephone number of Contractor. <br />6. Name and address of Architect. <br />7. Cross-reference to related systems in other operation and maintenance manuals. <br />C. Table of Contents: List each product included in manual, identified by product name, indexed to the <br />content of the volume, and cross-referenced to Specification Section number in Project Manual. <br />1. If operation or maintenance documentation requires more than one volume to accommodate data, <br />include comprehensive table of contents for all volumes in each volume of the set. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.