Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />FIELD ENGINEERING 01 71 23 - 2 <br />B. Do not change or relocate benchmarks or control points without prior written approval. Promptly report <br />lost or destroyed reference points or requirements to relocate reference points because of necessary <br />changes in grades or locations. <br />C. Promptly replace lost or destroyed Project control points. Base replacements on the original survey <br />control points. Establish and maintain a minimum of 2 permanent benchmarks on the site, referenced to <br />data established by survey control points. Record benchmark locations, with horizontal and vertical data, <br />on Project Record Documents. <br />D. Existing Underground Utilities and Equipment: The existence and location of underground and other <br />utilities and construction indicated as existing are not guaranteed. Before beginning site work, investigate <br />and verify the existence and location of underground utilities and other construction. Prime Contractor <br />and all subcontractors shall field locate all underground services whether shown on drawings or not, <br />including, but not limited to the following: utilities, underground wires, fiber optic lines, cables, conduits, <br />and pipes, prior to initiating any excavation on any area of the proposed site. Provide and pay for <br />underground utility locator service, metal detectors and hand digging as necessary to satisfy above <br />requirement. Provide drawing prior to commencing work signed by the locator service that delineates the <br />underground services. Locator service shall field locate all services with high visibility paint. Maintain <br />ground markings during the course of work and stay clear of underground service until work that may <br />damage underground services is complete. Prime Contractor (s) and their subcontractors shall be <br />responsible for utility services damaged during construction and shall repair at their own expense any <br />utility services damaged by their work. Repair within 24 hours or less. <br />E. Prior to construction, verify the location and invert elevation at points of connection of sanitary sewer, <br />storm sewer, and water-service piping. <br />3.2 PREFORMANCE <br />A. Work from lines and levels established by the property survey. Establish benchmarks and markers to set <br />lines and levels at each story of construction and elsewhere as needed to locate each element of the <br />Project. Calculate and measure required dimensions within indicated or recognized tolerances. Do not <br />scale Drawings to determine dimensions. Advise entities engaged in construction activities of marked <br />lines and levels provided for their use. As construction proceeds, check every major element for line, <br />level, and plumb. <br />B. Surveyor's Log: Maintain a surveyor's log of control and other survey work. Make this log available for <br />reference. Record deviations from required lines and levels, and advise the Architect when deviations <br />that exceed indicated or recognized tolerances are detected. On Project Record Drawings, record <br />deviations that are accepted and not corrected. On completion of foundation walls, major site <br />improvements, and other work requiring field-engineering services, prepare a certified survey showing <br />dimensions, locations, angles, and elevations of construction and site work. <br />C. Site Improvements: Locate and lay out site improvements, including pavements, stakes for grading, fill <br />and topsoil placement, utility slopes, and invert elevations. <br />D. Building Lines and Levels: Locate and lay out batter boards for structures, building foundations, column <br />grids and locations, floor levels, and control lines and levels required for mechanical and electrical work. <br />E. Existing Utilities: Furnish information necessary to adjust, move, or relocate existing structures, utility <br />poles, lines, services, or other appurtenances located in or affected by construction. Coordinate with local <br />authorities having jurisdiction. <br />END OF SECTION 01 71 23 <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.