Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3 <br />PART 3 - EXECUTION <br />3.1 INSTALLATION, GENERAL <br />A. Locate facilities where they will serve Project adequately and result in minimum interference with <br />performance of the Work. Relocate and modify facilities as required by progress of the Work. <br />B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no <br />longer needed or are replaced by authorized use of completed permanent facilities. <br />3.2 TEMPORARY UTILITY INSTALLATION <br />A. General: Install temporary service or connect to existing service. <br />1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, <br />if necessary, to make connections for temporary services. <br />B. Water Service: Use of Owner's existing water service facilities will be permitted, as long as facilities are <br />cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these <br />facilities to condition existing before initial use. <br />1. Where installations below an outlet might be damaged by spillage or leakage, provide a drip pan <br />of suitable size to minimize water damage. Drain accumulated water promptly from pans. <br />C. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction <br />personnel. Comply with authorities having jurisdiction for type, number, location, operation, and <br />maintenance of fixtures and facilities. <br />1. Use of Owner's existing toilet facilities will be not be permitted <br />D. Heating and Cooling: Provide temporary heating and cooling required by construction activities for <br />curing or drying of completed installations or for protecting installed construction from adverse effects of <br />low temperatures or high humidity. Select equipment that will not have a harmful effect on completed <br />installations or elements being installed. <br />E. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for <br />curing or drying of completed installations or for protecting installed construction from adverse effects of <br />high humidity. Select equipment that will not have a harmful effect on completed installations or <br />elements being installed. Coordinate ventilation requirements to produce ambient condition required and <br />minimize energy consumption. <br />F. Electric Power Service: Provide electric power service and distribution system of sufficient size, <br />capacity, and power characteristics required for construction operations. <br />1. Install electric power service overhead unless otherwise indicated. <br />Connect temporary service to Owner's existing power source, as directed by Owner. <br />G. Lighting: Provide temporary lighting with local switching that provides adequate illumination for <br />construction operations, observations, inspections, and traffic conditions. <br />1. Install and operate temporary lighting that fulfills security and protection requirements without <br />operating entire system. <br />2. Install lighting for Project identification sign. <br />H. Provide superintendent with cellular telephone or portable two-way radio for use when away from field <br />office. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.