Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1 <br />SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes requirements for temporary utilities, support facilities, and security and protection <br />facilities. <br />B. Related Sections include the following: <br />1. Division 01 Section "Summary" for limitations on utility interruptions and other work restrictions. <br />2. Division 01 Section "Submittal Procedures" for procedures for submitting copies of <br />implementation and termination schedule and utility reports. <br />1.3 DEFINITIONS <br />A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is complete, <br />insulated, and weathertight; exterior walls are insulated and weathertight; and all openings are closed with <br />permanent construction or substantial temporary closures. <br />1.4 USE CHARGES <br />A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum. Allow other <br />entities to use temporary services and facilities without cost, including, but not limited to, Owner's <br />construction forces, Architect, occupants of Project, testing agencies, and authorities having jurisdiction. <br />B. Water Service: CONTRACTOR WILL pay all water service connection expenses or charges for water <br />used by all entities for construction operations. CONTRACTOR WILL pay for actual water use charges <br />until Substantial Completion. <br />C. Electric Power Service: CONTRACTOR WILL pay all electric power service use charges for electricity <br />used by all entities for construction operations. CONTRACTOR WILL pay for actual electrical use <br />charges until Substantial Completion. <br />1.5 SUBMITTALS <br />A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction <br />personnel. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.