Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />QUALITY REQUIREMENTS 01 40 00 - 6 <br />3. Submitting a certified written report of each test, inspection, and similar quality-control service to <br />Architect with copy to Contractor and to authorities having jurisdiction. <br />4. Submitting a final report of special tests and inspections at Substantial Completion, which <br />includes a list of unresolved deficiencies. <br />5. Interpreting tests and inspections and stating in each report whether tested and inspected work <br />complies with or deviates from the Contract Documents. <br />6. Cost of retesting and re-inspecting corrected work shall be borne by the Contractor. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 ACCEPTABLE TESTING AGENCIES <br />A. Testing agency will be hired by and paid for by the Owner. <br />3.2 TEST AND INSPECTION LOG <br />A. Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and <br />inspection log for Architect's reference during normal working hours. <br />3.3 REPAIR AND PROTECTION <br />A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged <br />construction and restore substrates and finishes. <br />1. Provide materials and comply with installation requirements specified in other Specification <br />Sections. Restore patched areas and extend restoration into adjoining areas with durable seams <br />that are as invisible as possible. <br />2. Comply with the Contract Document requirements for Division 01 Section "Cutting and <br />Patching." <br />B. Protect construction exposed by or for quality-control service activities. <br />C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for <br />quality-control services. <br />END OF SECTION 01 40 00 <br /> <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.