Orange County NC Website
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />QUALITY REQUIREMENTS 01 40 00 - 6 <br />3. Submitting a certified written report of each test, inspection, and similar quality-control service to <br />Architect with copy to Contractor and to authorities having jurisdiction. <br />4. Submitting a final report of special tests and inspections at Substantial Completion, which <br />includes a list of unresolved deficiencies. <br />5. Interpreting tests and inspections and stating in each report whether tested and inspected work <br />complies with or deviates from the Contract Documents. <br />6. Cost of retesting and re-inspecting corrected work shall be borne by the Contractor. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 ACCEPTABLE TESTING AGENCIES <br />A. Testing agency will be hired by and paid for by the Owner. <br />3.2 TEST AND INSPECTION LOG <br />A. Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and <br />inspection log for Architect's reference during normal working hours. <br />3.3 REPAIR AND PROTECTION <br />A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged <br />construction and restore substrates and finishes. <br />1. Provide materials and comply with installation requirements specified in other Specification <br />Sections. Restore patched areas and extend restoration into adjoining areas with durable seams <br />that are as invisible as possible. <br />2. Comply with the Contract Document requirements for Division 01 Section "Cutting and <br />Patching." <br />B. Protect construction exposed by or for quality-control service activities. <br />C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for <br />quality-control services. <br />END OF SECTION 01 40 00 <br /> <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6