Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />QUALITY REQUIREMENTS 01 40 00 - 1 <br />SECTION 01 40 00 - QUALITY REQUIREMENTS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes administrative and procedural requirements for quality assurance and quality <br />control. <br />B. Testing and inspecting services are required to verify compliance with requirements specified or <br />indicated. These services do not relieve Contractor of responsibility for compliance with the Contract <br />Document requirements. <br />1. Specific quality-assurance and -control requirements for individual construction activities are <br />specified in the Sections that specify those activities. Requirements in those Sections may also <br />cover production of standard products. <br />2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance <br />and -control procedures that facilitate compliance with the Contract Document requirements. <br />3. Requirements for Contractor to provide quality-assurance and -control services required by <br />Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section. <br />C. Related Sections include the following: <br />1. <br />2. Division 01 Section "Cutting and Patching" for repair and restoration of construction disturbed by <br />testing and inspecting activities. <br />3. Divisions 02 through 49 Sections for specific test and inspection requirements. <br />1.3 DEFINITIONS <br />A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution <br />of the Work to guard against defects and deficiencies and substantiate that proposed construction will <br />comply with requirements. <br />B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution <br />of the Work to evaluate that actual products incorporated into the Work and completed construction <br />comply with requirements. Services do not include contract enforcement activities performed by <br />Architect. <br />C. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before <br />products and materials are incorporated into the Work to verify performance or compliance with specified <br />criteria. <br />D. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency <br />qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product <br />performance and compliance with industry standards. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.