Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 4 <br />3. Work Restrictions: Show the effect of the following items on the schedule: <br />a. Coordination with existing construction. <br />b. Limitations of continued occupancies. <br />c. Use of premises restrictions. <br />d. Provisions for future construction. <br />e. Seasonal variations. <br />f. Environmental control. <br />4. Work Stages: Indicate important stages of construction for each major portion of the Work, <br />including, but not limited to, the following: <br />a. Subcontract awards. <br />b. Submittals. <br />c. Purchases. <br />d. Mockups. <br />e. Fabrication. <br />f. Sample testing. <br />g. Deliveries. <br />h. Installation. <br />i. Tests and inspections. <br />j. Adjusting. <br />k. Curing. <br />E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not <br />limited to, the Notice to Proceed, Substantial Completion, and Final Completion. <br />F. Cost Correlation: At the head of schedule, provide a cost correlation line, indicating planned and actual <br />costs. On the line, show dollar volume of the Work performed as of dates used for preparation of <br />payment requests. <br />1. Refer to Division 01 Section "Payment Procedures" for cost reporting and payment procedures. <br />2. Contractor shall assign cost to construction activities on the CPM schedule. Costs shall not be <br />assigned to submittal activities unless specified otherwise but may, with Architect's approval, be <br />assigned to fabrication and delivery activities. Costs shall be under required principal subcontracts <br />for testing and commissioning activities, operation and maintenance manuals, punch list activities, <br />Project Record Documents, and demonstration and training (if applicable), in the amount of 5 <br />percent of the Contract Sum. <br />3. Each activity cost shall reflect an accurate value subject to approval by Architect. <br />4. Total cost assigned to activities shall equal the total Contract Sum. <br />5. This assigned cost to construction activities on the CPM schedule shall be used solely for the <br />generation of monthly payments and shall be used as the projects schedule of values. <br />G. Contract Modifications: For each proposed contract modification and concurrent with its submission, <br />prepare a time-impact analysis using fragments to demonstrate the effect of the proposed change on the <br />overall project schedule. <br />2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE) <br />A. General: Prepare network diagrams using AON (activity-on-node) format. <br />B. CPM Schedule: Prepare Contractor's Construction Schedule using a computerized, time-scaled CPM <br />network analysis diagram for the Work. <br />1. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use <br />no later than 30 days after date established for the Notice to Proceed. <br />a. Failure to include any work item required for performance of this Contract shall not excuse <br />Contractor from completing all work within applicable completion dates, regardless of <br />Architect's approval of the schedule. <br />2. Conduct educational workshops to train and inform key Project personnel, including <br />subcontractors' personnel, in proper methods of providing data and using CPM schedule <br />information. <br />3. Establish procedures for monitoring and updating CPM schedule and for reporting progress. <br />Coordinate procedures with progress meeting and payment request dates. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.