Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 2 <br />3. Total float is the measure of leeway in starting or completing an activity without adversely <br />affecting the planned Project completion date. <br />G. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater <br />detail. <br />H. Major Area: A story of construction, a separate building, or a similar significant construction element. <br />I. Milestone: A key or critical point in time for reference or measurement. <br />J. Network Diagram: A graphic diagram of a network schedule, showing activities and activity <br />relationships. <br />K. Resource Loading: The allocation of manpower and equipment necessary for the completion of an <br />activity as scheduled. <br />1.4 SUBMITTALS <br />A. Qualification Data: For scheduling consultant. <br />B. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a tabular <br />format: <br />1. Scheduled date for first submittal. <br />2. Specification Section number and title. <br />3. Submittal category (action or informational). <br />4. Name of subcontractor. <br />5. Description of the Work covered. <br />6. Scheduled date for Architect's final release or approval. <br />C. Contractor's Construction Schedule: Submit two opaque copies of initial schedule, large enough to show <br />entire schedule for entire construction period. <br />1. Submit an electronic copy of schedule. The cost-loaded construction schedule shall be used as the <br />Schedule of Values for cost-loaded activities. <br />D. CPM Reports: Concurrent with CPM schedule, submit three copies of each of the following computer- <br />generated reports. Format for each activity in reports shall contain activity number, activity description, <br />cost and resource loading, original duration, remaining duration, early start date, early finish date, late <br />start date, late finish date, and total float in calendar days. <br />1. Activity Report: List of all activities sorted by activity number and then early start date, or actual <br />start date if known. <br />2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending <br />order by activity number and then early start date, or actual start date if known. <br />3. Total Float Report: List of all activities sorted in ascending order of total float. <br />4. Earnings Report: Compilation of Contractor's total earnings from commencement of the Work <br />the Notice to Proceed until most recent Application for Payment. <br />E. Submit Monthly: Daily Construction Reports, Material Location Reports, and Field Condition Reports. <br />1.5 QUALITY ASSURANCE <br />A. Scheduling Consultant Qualifications: An experienced specialist in Cost Loaded CPM scheduling and <br />reporting, with capability of producing CPM reports and diagrams within 24 hours of Architect's request. <br />B. Prescheduling Conference: Conduct conference at Project site to comply with requirements in <br />Division 01 Section "Project Management and Coordination." Review methods and procedures related to <br />the Preliminary Construction Schedule and Contractor's Construction Schedule, including, but not limited <br />to, the following: <br />1. Verify availability of qualified personnel needed to develop and update schedule. <br />2. Discuss constraints, including phasing, work stages, area separations, and interim milestones. <br />3. Review schedule for work of Owner's separate contracts. <br />4. Review time required for review of submittals and resubmittals. <br />5. Review requirements for tests and inspections by independent testing and inspecting agencies. <br />6. Review and finalize list of construction activities to be included in schedule. <br />7. Review submittal requirements and procedures. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.