Browse
Search
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-414-E-AMS-Riggs-Harrod Builders, Inc-SHSC Roof & HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 3:29:08 PM
Creation date
8/3/2021 3:22:07 PM
Metadata
Fields
Template:
Contract
Date
6/24/2021
Contract Starting Date
6/25/2021
Contract Ending Date
7/28/2021
Contract Document Type
Contract
Amount
$1,348,479.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHSC HVAC and Roof Replacement Smith Sinnett / 2020072 <br />Orange County, North Carolina <br /> <br />PAYMENT PROCEDURES 01 29 00 - 1 <br />SECTION 01 29 00 - PAYMENT PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section specifies administrative and procedural requirements necessary to prepare and process <br />Applications for Payment. <br />B. Related Sections include the following: <br />1. Division 01 Section "Allowances" for procedural requirements governing handling and processing <br />of allowances. <br />2. Division 01 Section "Contract Modification Procedures" for administrative procedures for <br />handling changes to the Contract. <br />3. Division 01 Section "Unit Prices" for administrative requirements governing use of unit prices. <br />1.3 DEFINITIONS <br />A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to <br />various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. <br />1.4 SCHEDULE OF VALUES <br />A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's <br />Construction Schedule. <br />1. Correlate line items in the Schedule of Values with other required administrative forms and <br />schedules, including the following: <br />a. Application for Payment forms with Continuation Sheets. <br />b. Submittals Schedule. <br />c. Contractor's Construction Schedule. <br />d. List of Subcontractors. <br />e. Schedule of Allowances <br />f. Schedule of Alternates. <br />g. List of Products. <br />h. List of Principal Suppliers and Fabricators. <br />2. Submit the Schedule of Values to Architect at earliest possible date but no later than (7) seven <br />days before the date scheduled for submittal of initial Applications for Payment. <br />3. Subschedules: Where the Work is separated into phases requiring separately phased payments, <br />provide subschedules showing values correlated with each phase of payment. <br />B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the <br />Schedule of Values. Provide at least one line item for each Specification Section. <br />1. Identification: Include the following Project identification on the Schedule of Values: <br />a. Project name and location. <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
The URL can be used to link to this page
Your browser does not support the video tag.