Orange County NC Website
<br />Revised 07/20 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE SHSC Roof & HVAC - 5308 <br /> FY 2020-2021 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 16th day of <br />June, 2021, by and between Riggs-Harrod Builders, Inc, (hereinafter called the “Contractor”), and Orange <br />County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange <br />County,” or “Owner”). <br /> <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> <br /> The Contract Documents consist of this Agreement , the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of a ny inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br /> <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br /> <br />c. Designer approved communications and field orders. <br /> <br />d. Request for Proposals and addenda thereto. <br /> <br />e. Proposal. <br /> <br />2. SCOPE OF WORK <br /> <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Smith Sinnett Architecture (Sheet G0-01, G0-02, S1-01, <br />A0-01, A0-02, A1-01, A5-01, M0-00, M0-01, M0-02, M0-03, M1-01, M1-03, M2-01, M3-01, <br />M5-01, M5-02, M5-03, M6-01, M6-02. M6-03. M7-01, E0-00, E0-01, E2-01, E2-02, E4-01, <br />E5-01 dated 1/29/2021, SHSC Roof and HVAC Specifications dated Addendum 1 dated <br />3/8/2021, Addendum 2 dated 3/11/2021, Addendum 3 dated 3/15/2021 and Addendum 4 dated <br />3/17/2021) <br /> <br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6