<br />Revised 07/20
<br />
<br />
<br />1
<br /> [Departmental Use Only]
<br /> TITLE SHSC Roof & HVAC - 5308
<br /> FY 2020-2021
<br />NORTH CAROLINA
<br /> CONSTRUCTION AGREEMENT OVER $250,000.00
<br />ORANGE COUNTY
<br />
<br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 16th day of
<br />June, 2021, by and between Riggs-Harrod Builders, Inc, (hereinafter called the “Contractor”), and Orange
<br />County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange
<br />County,” or “Owner”).
<br />
<br />
<br />W I T N E S S E T H:
<br />
<br /> That the Contractor and the Owner, for the consideration herein named, agree as follows:
<br />
<br />1. CONTRACT DOCUMENTS; PRIORITY
<br />
<br /> The Contract Documents consist of this Agreement , the General Conditions which are fully
<br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field
<br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract
<br />Documents form the Contract. In the event of a ny inconsistency between or among the Contract Documents
<br />the Contract Documents shall be interpreted in the following order of priority:
<br />
<br />a. This Agreement and incorporated General Conditions attached as Exhibit 1.
<br />
<br />b. Designer approved and stamped construction documents and drawings and written
<br />specifications.
<br />
<br />c. Designer approved communications and field orders.
<br />
<br />d. Request for Proposals and addenda thereto.
<br />
<br />e. Proposal.
<br />
<br />2. SCOPE OF WORK
<br />
<br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible
<br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed
<br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents,
<br />which are made a part hereof as if fully contained herein:
<br />
<br />a. Construction Drawings prepared by Smith Sinnett Architecture (Sheet G0-01, G0-02, S1-01,
<br />A0-01, A0-02, A1-01, A5-01, M0-00, M0-01, M0-02, M0-03, M1-01, M1-03, M2-01, M3-01,
<br />M5-01, M5-02, M5-03, M6-01, M6-02. M6-03. M7-01, E0-00, E0-01, E2-01, E2-02, E4-01,
<br />E5-01 dated 1/29/2021, SHSC Roof and HVAC Specifications dated Addendum 1 dated
<br />3/8/2021, Addendum 2 dated 3/11/2021, Addendum 3 dated 3/15/2021 and Addendum 4 dated
<br />3/17/2021)
<br />
<br />DocuSign Envelope ID: 94E7997D-4F29-42F6-A9B4-0A160438D2A6
|