Browse
Search
Planning Board - 080421 ORC Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2021
>
Planning Board - 080421 ORC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:33:37 AM
Creation date
7/28/2021 10:27:30 AM
Metadata
Fields
Template:
BOCC
Date
8/4/2021
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 95 <br /> Section 6.22: PERFORMANCE GUARANTEE STAN DARDSerformance Gurantee246F <br /> x}_254 <br /> (9) If SCM deficiencies are found during SCM inspection and/or the submitted SCM <br /> documents are considered bV the Erosion Control Officer to be incomplete, then <br /> the Erosion Control Officer shall direct the owning entitV that the necessary SCM <br /> improvements be made and/or documents corrected and resubmitted for <br /> approval. Upon completion, the SCM improvements shall be re-inspected bV the <br /> Erosion Control Officer. <br /> If deficiencies are found, the Erosion Control Officer shall d'rec++hat the <br /> necessary improvements ho made and/or documents corrected and resubmitted <br /> for approval Upon comple+inn the imprrn iem en+s shall he re`inspec+ed 2a`2 <br /> (10) No sooner than one Vear after issuance of the Certificate of Stormwater <br /> Compliance for the SCM, the owning entitV maV petition the Planning Director to <br /> release the remaining value of the SCM performance guarantee. Upon receipt of <br /> said petition, the Erosion Control Officer shall inspect the SCM to determine <br /> whether the SCM is performing as designed and intended. The Erosion Control <br /> Officer shall present the petition, the SCM inspection report, and <br /> recommendations to the Planning Director. <br /> (a) If the Planning Director accepts the petition and SCM inspection report, <br /> then the Erosion Control Officer shall release the remaining value of the <br /> SCM performance guarantee. <br /> If the Planning Director does not accept the petition and/or SCM <br /> inspection, then the Erosion Control Officer shall provide the owning <br /> entitV with instructions to correct any SCM deficiencies necessarV for the <br /> release of the remaining value of the SCM Performance Guarantee.0- e <br /> vear from the r nrdin„ of the deed easeMen+s and m in+enance <br /> aqreem on+ +he app!oGaRt m pe+i+inn far the release of the r <br /> value of the performaRGG quaran+ee <br /> Upon receipt of said pe+it'nn the Erosion Control Officer shall 'aspen++he <br /> SCMto determine whether the controls are perform'no as des'n ped and <br /> ntended if th-re�i�the rem ininn—funads shaall_ .l be returned.retu-ne,_ped.if not, tl-fe <br /> Erosion Control Officer wn !! note identified deficiencies and req 're <br /> corecr <br /> +�r_v_v_rmor_r_ornn nfof same (ince completed, the applicant ran request a folln)ni <br /> up inspection <br /> -I-B;13 <br /> 4W4 <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.