Browse
Search
Planning Board - 080421 ORC Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2021
>
Planning Board - 080421 ORC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:33:37 AM
Creation date
7/28/2021 10:27:30 AM
Metadata
Fields
Template:
BOCC
Date
8/4/2021
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures 9 <br /> Section 2.5: Site Plan Review <br /> (D) if a guaraRtee is Ret submitted, the developer MUSt iRstall all required irnpreverReRtS4G <br /> the oo _-.fiofortK,., .,f the CO .,Rty r tA_ io of the ZE)RiRg pliaRGe per <br /> mif <br /> rrta. <br /> (A) If a PP-erformance g6uarantee is required, the provisions of Section 2.27 of this <br /> Ordinance shall apply.' <br /> 2.5.7 Additional Requirements for Overlay Districts <br /> (A) Efland-Cheeks Highway 70 Corridor Overlay District <br /> (1) Approval Requirements <br /> Within the Efland-Cheeks Highway 70 Corridor Overlay District (ECOD), no <br /> construction activity shall begin nor shall any conversion of existing single-family <br /> residence to a non-residential land use, excavation, soil removal, grading or <br /> disturbance of vegetation including trees, land--disturbing activity associated with <br /> a non-residential land use, be commenced, nor any sign erected until such time <br /> as a site plan has been approved and a permit issued by the Planning Director in <br /> accordance with this Section and Section 2.4 of this Ordinance. <br /> (B) Efland Interstate Overlay District <br /> (1) Approval Requirements <br /> Within the Efland Interstate Overlay District, no construction activity shall begin <br /> nor shall any excavation, soil removal, filling, grading or disturbance of <br /> vegetation, including trees, be commenced, nor any sign erected for any use <br /> subject to the requirements of the overlay district until such time as a site plan <br /> has been approved and a permit issued by the Planning Director in accordance <br /> with this Section and Section 2.4 of this Ordinance. <br /> (C) Efland Village Overlay District <br /> (1) Approval Requirements <br /> Within the Efland Village Overlay District, no construction activity shall begin nor <br /> shall any excavation, soil removal, filling, grading or disturbance of vegetation, <br /> including trees, be commenced, nor any sign erected for any use subject to the <br /> requirements of the overlay district until such time as a site plan has been <br /> approved and a permit issued by the Planning Director in accordance with this <br /> Section and Section 2.4 of this Ordinance. <br /> (D) Major Transportation Corridor Overlay District <br /> (1) Approval Requirements <br /> Within the Major Transportation Corridor District, no construction activity shall <br /> begin nor shall any excavation, soil removal, filling, grading or disturbance of <br /> vegetation, including trees, be commenced, nor any sign erected until such time <br /> as a site plan has been approved and a permit issued by the Planning Director in <br /> accordance with this Section and Section 2.4 of this Ordinance. <br /> 2.5.8 Additional Requirements for Economic Development Districts <br /> (A) Prior to submission of an application for site plan approval, applicants shall meet with <br /> representatives of the Planning and Inspections, and Economic Development <br /> Departments to identify policies, procedures, regulations, and fees applicable to <br /> development proposals. <br /> 'Consistent with Section Law 2019-79,and to avoid confusion,staff has created a central section addressing the <br /> review/processing/acceptance of Performance Guarantees for projects involving the issuance of a Zoning <br /> Compliance Permit or Subdivision final plat approval. This is a simple reference to the new section dealing with <br /> Performance Guarantees. <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.