Orange County NC Website
Article 2: Procedures $ <br /> Section 2.5: Site Plan Review <br /> (E) Following review of the site plan, the Planning Director shall take final action on the <br /> application within 21 days of acceptance of a complete application. Final action shall be <br /> one of the following: <br /> (1) Approval, <br /> (2) Approval with conditions, or <br /> (3) Denial. <br /> Failure to meet the criteria for site plan approval listed herein, and/or to address all <br /> review comments solicited during plan review, will result in denial of the application. <br /> (F) If a plan is approved with conditions, no zoning authorization allowing land--disturbing <br /> activity or subsequent building permit shall be issued until all conditions of approval have <br /> been met to the satisfaction of Orange County. <br /> (G) Site plan approval and the issuance of a Zoning Compliance Permit does not establish a <br /> vested right to develop the property should zoning regulations change subsequent to plan <br /> approval. <br /> 2.5.5 Vesting of Site Plan <br /> (A) At the option of the Applicant, a site plan may be vested for a period of not less than two <br /> nor more than five years. Multi-phased developments, as defined in NCGS 160D-108, <br /> shall be vested for a period of seven years from the time a site plan approval is granted <br /> for the initial phase of the multi-phased development. <br /> (B) To become vested, a site specific vesting plan must be approved by the Board of County <br /> Commissioners through either the normal project approval process if the Board of County <br /> Commissioners is the approval authority, or, in the case the Board of County <br /> Commissioners is not the normal approval authority, by the Board of County <br /> Commissioners after a legislative hearing. <br /> (1) Said legislative hearing shall follow the public notification procedures set forth in <br /> Section 2.8.7. <br /> (2) The Board of County Commissioners may approve the site specific vesting plan <br /> with such terms and conditions as may reasonably be necessary to protect the <br /> public health, safety, and welfare. Such conditional approval shall result in a <br /> vested right. Failure to abide by such terms and conditions shall result in a <br /> forfeiture of vested rights. <br /> (C) An approved site specific vesting plan shall contain the following statement: "Approval of <br /> this plan establishes a zoning vested right under NCGS 160D-108. Unless terminated at <br /> an earlier date, the zoning right shall be valid until <br /> (D) The site specific vesting plan for a project which requires the preparation of an <br /> Environmental Impact Statement(EIS) in accordance with Section 6.16 of this Ordinance <br /> shall not be approved until the EIS has been made available for public review, and has <br /> been presented to the Board of County Commissioners in accordance with Section 2.23 <br /> of this Ordinance. <br /> 2.5.6 Guarantee of Improvern ^*Performance Guarantee <br /> (A) if a Of Fecluired as a GE)RditiGR Of Site plaR approval, the <br /> 0FFeVGGable letter of nredit by a ied inotifiY4G <br /> (B) The guarantee shall be effective for 12 months and shall include the cost of the <br /> im nrnyo rents plus 10 <br /> (C) Prior to issuance of any site plan <br /> the guarantee shall be approved by the <br /> County attorney. approval, <br /> Co <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-12 <br />